Chapter 2 Installation
www.supmea.com
- 3 -
Chapter 2 Installation
2.1 Instrument installation
The installation site and method of the instrument are explained, the part shall be
carefully read during the installation.
Notes for installation
The instrument is panel mounted.
Please install it at the place with good ventilation in order to prevent the
internal temperature of the instrument from rising.
Horizontal installation shall be realized as possible
The following places shall be avoided during the installation
Do not expose direct to sunlight and near heaters.
The location where the environment temperature exceeds 60
℃
during the
work.
The location where the environment humidity exceeds 85% during the
work.
The vicinity of the electromagnetic occurring sources.
The sites with strong mechanical vibration.
The site where the temperature is changed a lot and the moisture
condensation is easily formed.
Places with lots of lampblack, steam, moisture, dust and corrosive gas.
Installation
A 138mm*138mm installation hole is opened at the instrument cabinet or
installation panel (The thickness of the mounting panel is 1.0 ~ 5.0mm).
Insert the controller into the square mounting hole and fasten the holder.