Chapter 2 Installation
www.supmea.com
- 5 -
Figure 1 Sketch diagram of the common installation method
①
Side wall installation
②
Flange mounted at the top
③
Pipe installation
④
Top installation
⑤
Submersible installation
⑥
Flow-through installation
The interface must be in 15 oblique angle, or it will affect the normal test
and use of the electrode. We won’t be responsible for any results
due to this.