background image

10103030P1 • July 2011

© 2011 UTC Fire & Security. All rights reserved.

Installation Supplies Provided

•  TRAC-Box BT Drill Template

•  TRAC-Box BT

•  TRAC-Box BT Mounting Bracket

•  TRAC-Box BT Shackle

•  Shackle Retainer Clip for BT

Hardware Not Provided

•  (6) 5/16-18UNC all-thread rods

•  (12) 5/16" lock washers

•  (12) 5/16-18UNC nuts

•  (6) 5/16" fender washers

An installation kit is available from Supra. The kit 

contains all necessary hardware for installing the 

TRAC-Box BT per recommended instructions. 

Additionally, an interior cover plate is available.

Installation Tools Required

•  Drill, Hammer Drill (as appropriate)

•  Drill Bits (as appropriate)

•  Wrenches (as appropriate)

•  Pliers or Vice Grips

•  Level or Punch

•  Pen or pencil

•  Dremel tool or Hacksaw

Overview

Mount the TRAC-Box BT in a location that is convenient 

for your keyholders. To meet ADA requirements, the 

units must be installed 48" or 4 feet from ground to 

center of the device. If you choose an installation method 

other than the one described in these instructions, Supra 

will not be responsible for replacing the TRAC-Box BT if 

it is damaged or destroyed upon removal.

Select a Location to Mount Bracket

1.  Mount the bracket near the point of entry and, when 

possible, mount the bracket under an awning or 

cover in a lit area.

2.  The bracket must be mounted upright against a flat 

surface.

3.  The bracket must be mounted so the bottom of 

the bracket is a minimum of 10" from any ledge or 

obstruction (the key container drops from the bottom 

of the TRAC-Box BT.

Install the Bracket

1.  Before drilling, ensure that no interference will occur 

with any plumbing, electrical, fire or security systems, 

etc.

Figure 1. Mounting Bracket Drill Locations

TRAC-Box BT

 Bracket

Mounting Instructions

6 bolt locations — 

Refer to drill template 

for preferred locations

2.  Once the location for the unit has been decided, 

position and level the drilling template on the wall 

and punch or mark the holes for drilling. Please use 

the preferred hole locations, which are marked with 

a ■ on the drilling template, to minimize physical 

interference when the mounting hardware and TRAC-

Box BT are installed.

3.  Using the correct bit for the type of wall, drill size 1/2" 

holes to accommodate 5/16" bolts.

4.  Insert a lock washer and a nut on all four of the all-

thread rods. It is important that each all-thread rod is 

flush with the outside of each nut.

5.  Position the bracket against the wall and insert the 

four all-thread rods into the holes through the wall. 

IMPORTANT: The bracket must have the top (closed 

end) up and be mounted upright as the key container 

must drop downward.

6.  On the other side of the wall, mount the interior cover 

plate (optional) onto the all-thread rods. Put a 5/16" 

Page 1

Reviews: