10103030P1 • July 2011
© 2011 UTC Fire & Security. All rights reserved.
Installation Supplies Provided
• TRAC-Box BT Drill Template
• TRAC-Box BT
• TRAC-Box BT Mounting Bracket
• TRAC-Box BT Shackle
• Shackle Retainer Clip for BT
Hardware Not Provided
• (6) 5/16-18UNC all-thread rods
• (12) 5/16" lock washers
• (12) 5/16-18UNC nuts
• (6) 5/16" fender washers
An installation kit is available from Supra. The kit
contains all necessary hardware for installing the
TRAC-Box BT per recommended instructions.
Additionally, an interior cover plate is available.
Installation Tools Required
• Drill, Hammer Drill (as appropriate)
• Drill Bits (as appropriate)
• Wrenches (as appropriate)
• Pliers or Vice Grips
• Level or Punch
• Pen or pencil
• Dremel tool or Hacksaw
Overview
Mount the TRAC-Box BT in a location that is convenient
for your keyholders. To meet ADA requirements, the
units must be installed 48" or 4 feet from ground to
center of the device. If you choose an installation method
other than the one described in these instructions, Supra
will not be responsible for replacing the TRAC-Box BT if
it is damaged or destroyed upon removal.
Select a Location to Mount Bracket
1. Mount the bracket near the point of entry and, when
possible, mount the bracket under an awning or
cover in a lit area.
2. The bracket must be mounted upright against a flat
surface.
3. The bracket must be mounted so the bottom of
the bracket is a minimum of 10" from any ledge or
obstruction (the key container drops from the bottom
of the TRAC-Box BT.
Install the Bracket
1. Before drilling, ensure that no interference will occur
with any plumbing, electrical, fire or security systems,
etc.
Figure 1. Mounting Bracket Drill Locations
TRAC-Box BT
™
Bracket
Mounting Instructions
6 bolt locations —
Refer to drill template
for preferred locations
2. Once the location for the unit has been decided,
position and level the drilling template on the wall
and punch or mark the holes for drilling. Please use
the preferred hole locations, which are marked with
a ■ on the drilling template, to minimize physical
interference when the mounting hardware and TRAC-
Box BT are installed.
3. Using the correct bit for the type of wall, drill size 1/2"
holes to accommodate 5/16" bolts.
4. Insert a lock washer and a nut on all four of the all-
thread rods. It is important that each all-thread rod is
flush with the outside of each nut.
5. Position the bracket against the wall and insert the
four all-thread rods into the holes through the wall.
IMPORTANT: The bracket must have the top (closed
end) up and be mounted upright as the key container
must drop downward.
6. On the other side of the wall, mount the interior cover
plate (optional) onto the all-thread rods. Put a 5/16"
Page 1