background image

Heatseeker UniPanel®

 

Solar Pool Heating

21

 Subject to clause 9, any condition or warranty which 

would otherwise be implied in this agreement or in 

relation to the Product is hereby excluded.

 Where legislation implies in this agreement or in 

relation to the Product any condition or warranty, 

and that legislation avoids or prohibits provisions in 

a contract excluding or modifying the application 

of or exercise of or liability under such condition or 

warranty, the condition or warranty shall be deemed to 

be included in this agreement. However, the liability of 

Supreme Solar Pty Ltd for any breach of such condition 

or warranty shall be subject to clause 14 and any other 

applicable exclusions set out in this agreement, be 

limited, at the option of Supreme Solar Pty Ltd, to one or 

more of the following:

 

(a)   if the breach relates to goods:

 

 

(i)   the replacement of the goods or the supply of 

equivalent goods;

 

 

(ii)  the repair of such goods;

 

 

(iii)   the payment of the cost of having the goods 

repaired; and

 

(b)  if the breach relates to services:

 

 

(i)   the supplying of the services again; or

 

 

(ii)   the payment of the cost of having the   

services supplied again.

What Supreme Solar Pty Ltd will do

10   For defects relating to installation of the Product, 

Supreme Solar Pty Ltd will, in its absolute discretion:

 

(a)   repair the Product or pay for the cost of having the 

Product repaired; or

 

(b)   replace the Product or supply an equivalent 

Product; or

 

(c)   pay for the cost of replacing the Product or 

acquiring an equivalent Product;

 

 if the terms and conditions of this warranty are satisfied. 

Supreme Solar Pty Ltd will not be liable for any other 

loss or damage (including consequential or indirect 

damages).

11   Supreme Solar Pty Ltd reserves the right to charge the 

Purchaser, at Supreme Solar Pty Ltd’s current hourly 

rate, for the cost of examining the Product if such 

examination by Supreme Solar Pty Ltd reveals that the 

Product:

 

(a)   is not defective; or

 

(b)   is defective as a result of any of the events specified 

in paragraph 7.

What the Purchaser must do

12   Any claim under this warranty must be made at the 

earliest stage that the defect becomes obvious to 

enable prompt action and to avoid further damage and 

must be made no later than one (1) month of the defect 

becoming obvious.

13   Any claim for warranty must be accompanied by 

appropriate documentation which stipulates the date 

of installation, the invoice number, the details of the 

alleged defect and any other information reasonably 

required by Supreme Solar Pty Ltd.

14   Purchaser agrees to pursue any claims in relation to 

defective parts against the manufacturers or suppliers 

referred to in clause 3, 4, 5 and 6.

Whole agreement

15   This warranty and any warranties implied by law which 

are not capable of being excluded or modified from the 

whole warranty agreement between Supreme Solar Pty 

Ltd and the Purchaser and all other warranties, express 

or implied, whether arising by statute or otherwise, are 

excluded and cancelled.

Governing law

16   This warranty is governed by the laws of the State 

specified in paragraph 17(c).

Defined terms

17 (a) 

 Purchaser

 

 The person who has purchased the 

Product and is able to produce proof 

of such purchase

 (b) 

Product

   

 Supreme Solar Pty Ltd solar pool   

heating system

 (c)

   Governing  law 

 

(paragraph 16): 

 

Victoria, Australia

Consumer guarantee

18   This warranty is provided in addition to consumer 

guarantees and does not alter, limit or replace them.

Summary of Contents for Heatseeker UniPanel

Page 1: ...User Manual SAAWARDSOF EXCELLENCE 2017GOLD QLD AWARDS OF EXCELLENCE 2017 GOLD AWARDS OF EXCELLENCE 2017 GOLD SAAWARDSOF EXCELLENCE 2017GOLD SA AWARDS OF EXCELLENCE 2017 GOLD SAAWARDSOF EXCELLENCE 201...

Page 2: ...ton Grange NSW 2567 P 02 4648 4766 solar nsw supremeheating com au salesnsw supremeheating com au QLD Office Brisbane QLD 4001 M 0455 064 765 solarqld supremeheating com au SA Office Wingfield SA 5013...

Page 3: ...mperature Setting Up and Down Buttons 09 Enter Button 10 ControllerTroubleshooting 11 No PowerToThe Display 11 Pipe Roof Sensor Faults 11 Pump Faults 12 Installer Setup 13 Additional Information 13 So...

Page 4: ...equipment Installation and service must be performed by a qualified installer The manufacturer will not be responsible for any damage to the system caused by improper installation operation or mainten...

Page 5: ...anel Solar Pool Heating 03 Specifications 48 3 MANIFOLD 43 PORT DETAIL 880 20 SLOT PORT DETAIL 1095 PORT TO PORT WIDTH 1136 PORT TO PORT WIDTH 1114 PANEL WIDTH ACROSS EDGES 1030 PANEL WIDTH ACROSS EDG...

Page 6: ...r flat roof is acceptable 2 Shade Try to avoid positioning the solar collectors on a roof that is going to be shaded heavily throughout the day The best solar gains are made three hours either side of...

Page 7: ...Heatseeker UniPanel Solar Pool Heating 05 Typical Arrangement...

Page 8: ...Heating 06 System Assembly Panel PVC Adaptor Port Insert Manifold Coupling Aluminium Rail Coupling Cover Manifold Fixing Clip Lock Nut Rail End Cap Rail Channel Slider Rail Joining Strip BOTTOM MANIFO...

Page 9: ...Heating 07 Accessories Rail Mounting System Accessories List Manifold Coupling Coupling Cover Manifold Port Insert Panel PVC Adaptor Manifold Fixing Clip Rail End Cap Rail Channel Slider Lock Nut Alu...

Page 10: ...nt heating manual and standby mode features Aqua Gen 5 Aqua Gen 5BR Aqua Gen 5PV To determine what model controller you have please refer to your quotation invoice or the model number can be found nea...

Page 11: ...required This is a better option than turning off the controller as it will flush treated pool water through the solar system as well as prolong pump bearing and mechanical seal life The pump will run...

Page 12: ...clock you will have to set the time of day Set hours then minutes 3 SYSTEM System sub menu EXIT COOLING LCDTIME HOURS SYSTEM SUB MENU EXIT Press on this menu to return to automatic operation COOLING...

Page 13: ...FAULTS Swap the sensor locations simply put the pipe sensor in the roof socket and the roof sensor in the pipe socket If the fault moves from pipe to roof or vice versa then you can be certain that t...

Page 14: ...operate then unplug it from the power point and connect it to the 240V socket marked PUMP at the bottom of the controller Apply power to the controller and if the pump starts instantaneously before t...

Page 15: ...anels cannot drain down and will require a wetted roof sensor for this mode CAL Calibrate the pool sensor Additional Information 1 If any of the menu items are left unattended for 3 minutes the menu w...

Page 16: ...ot use or operate swimming pools spas or spa baths if a suction cover is broken missing or loose Small children using the pool or spa must always have close adult supervision SS Series Solar Pump Oper...

Page 17: ...ed in the pipe work and pump may be expelled STEP 4 If prime is not established within approximately 2 minutes as evidenced by a strong flow of water from the outlet switch off the pump and repeat the...

Page 18: ...OT START Solar controller is not triggering pump to turn on Refer to controller instruction manual Pump is not plugged into power Blockage is preventing rotation Electrical failure Automatic overload...

Page 19: ...set to Pipe Protection Refer to controller operation instructions on page 08 Failure to observe this instruction may cause damage and void all warranties related to panels pipe work and fittings The s...

Page 20: ...ending on the size of the system and during this period the resulting turbulence created will cause some associated noise Vacuum relief valves should be inspected regularly 2 4 months during the month...

Page 21: ...O ring to ensure positive seal 3 Ensure electrical passage for cooling airflow to prevent fusing or shock hazards 4 Maintain a clear passage for cooling airflow to prevent overheating of motor 5 Main...

Page 22: ...es or SSV Series of Automatic Controllers a three 3 year limited warranty from Dontek Electronics Pty Ltd 19 Melrich Road Bayswater Victoria 3153 Phone 03 9762 8800 Email service dontekelectronics com...

Page 23: ...for any other loss or damage including consequential or indirect damages 11 Supreme Solar Pty Ltd reserves the right to charge the Purchaser at Supreme Solar Pty Ltd s current hourly rate for the cos...

Page 24: ...supremeheating com au 1300 787 978...

Reviews: