Standard Operating Procedures
L410 UVP-E20
Document No.:
SOP-L410-0
Page EE - 67
Rev: 1
Date:JAN 18
Prepared by: LA
Checked by : CLS
FAILURE OF ONE AC - GENERATOR
AB 16
Item
Action
CM
AC GENERATOR LH or RH switches
CHECK ON
PM
AC GENERATOR
switch of failed unit
OFF than ON
PM
If AC GENERATOR is fault:
AC GENERATOR
switch of failed unit
OFF
PM
FAILURE OF ONE OF 36 V AC INVERTER
AB 17
Item
Action
CM
INVERTER 36V AC I or II switches
CHECK ON
PM
INVERTER 36V AC I or II switches
OFF than ON
PM
If INVERTER 36V AC is fault:
INVERTER 36V AC
switch of failed unit
OFF
PM
Summary of Contents for L410 UVP-E20
Page 5: ......