Standard Operating Procedures
L 410 UVP-E20
Document No.:
SOP-L410-0
Page 3 - 3
Rev: 1
Date: JAN 18
Prepared by: LA
Checked by: CLS
3.2.2 Propeller Pitch Lock Test
Refer toAppendix E or AFMSection IV Normal Procedures.
All other checklists shall then becarried out as follows:
-
The challenge shall be called aloud by the PM.
-
The PF / PM shall check that the item has been carried out and give
theprescribed response.
-
Where the checklist response is nominated as
“Set”
or
“As Required”
,
theresponse shall be appropriate to the situation. Responding “As
Required” isan inappropriate response.
-
Strict adherence to the checklist is required at all times, and the
checklistmust not be read past an item until it is complete in both action
andresponse.
-
Checklists cannot be held at a particular point if interrupted. The
checklistmust be started again from the beginning to ensure nothing has
beenmissed.
Summary of Contents for L410 UVP-E20
Page 5: ......