background image

DIGITAL PATCH CLAMP AMPLIFIER SYSTEMS

 

OVERVIEW 

Please read these instructions carefully before installation. This guide covers both the 

dPatch

® 

 and dPatch-2 systems. If you have any questions or need additional information, 

contact Sutter Instrument.

OPERATING SYSTEM REQUIREMENTS

Windows 7 or later: 64-bit versions 

Mac OS 10.11 (El Capitan) or later

INSTALL HARDWARE

1.  Attach dPatch headstage(s) to amplifier front panel: HEADSTAGE 1 & 2.  dPatch 

headstages can be attached to any headstage port; they are not “matched” to a port.

2.  OPTIONAL: Attach dPatch Screw Terminal Board or dPatch Expansion Panel to 

amplifier rear panel: DIGITAL OUTPUTS.

3.  Attach USB 3 cable to USB 3 port on amplifier rear panel and your computer. The 

connector on the dPatch rear panel must click in place.

4.  Attach power cord to amplifier rear panel and a grounded power outlet.

INSTALL IGOR PRO/SUTTERPATCH SOFTWARE

1.  Power on computer.

2.  If you have Internet access, download the latest version of the SutterPatch Software 

installer from www.sutter.com/AMPLIFIERS/SutterPatch.html 

3.  If Internet access is not available, attach the included USB flash drive to your 

computer.

4.  Double click on ‘SutterPatch_Installer_with_Igor’ (Windows) or                      

‘sutterpatch_mac_full’ (Mac OS).

5.  Follow the installer prompts for current Igor software.

6.  Open Igor Pro and activate the Igor Pro license as instructed:

i.  Serial Number:

ii.  Activation Key:

TEST SYSTEM 

1.  Model Cell: 

 

a.  Attach Model Cell to HEADSTAGE 1 and tighten the collar.  

 

b.  Attach ground wire to HEADSTAGE 1 and Model Cell (gold plugs).

 

c.  Surround with aluminum foil shielding and ground it to the headstage    

      

     ground connector.

2.  Click icon to launch Igor:  

3.  SutterPatch welcome screen will open. Press ‘Start’.

4.  On dashboard window:  

 

I.  Click on the Acquire Data icon: 

 

 

II.  Click on the Membrane Test icon: 

5.  Scope + Analysis windows open: 

 

(Actual analysis values depend on dPatch filter settings)

 

I.  With the Model Cell switch in Bath position, click the Bath button.

 

  Pipette Resistance  

= ~10 MΩ

 

II.  With the Model Cell switch in Seal position, click the Seal button.

 

  Seal Resistance    

>    10,000 MΩ

 

III. With the Model Cell switch in Cell position, click the Cell button.

 

  Access Resistance  

= ~10 MΩ

 

  Membrane Resistance  

= ~500 MΩ

 

  Membrane Capacitance   = ~28 pF

 

Move the Model Cell and shielding to HEADSTAGE 2 (if installed), set the Scope 

window to ‘Headstage 2’, and repeat steps I – III.

BACK PANEL 

affix label here

Acquire Data

Membrane Test

DIGITAL PATCH CLAMP AMPLIFIER SYSTEM

QUICK START GUIDE

dPATCH

®

 

/ dPATCH-2 

SUTTER INSTRUMENT

19

1

37 

20

PIN

FUNCTION

1 - 16

Digital Output 1 - 16

17 - 19

+5 V

20 - 35

Ground

36 - 37

+5 V

DIGITAL OUTPUTS 1-16

DIGITAL OUTPUTS PINOUT

Reviews: