CHASSIS 5-39
HANDLEBAR RIGHT SIDE PARTS
• Remove the throttle cable by removing the throttle grip case
1
.
• Remove the throttle grip
2
.
• Disconnect the front brake cable
3
and brake switch
4
.
(UY125)
• Remove the front brake lever holder
5
. (UY125)
• Disconnect the brake light switch lead wires, and remove the
front brake master cylinder. (UY125S)(
"
5-30)
• Remove the handlebars by removing the handlebar clamp
nut.
INSTALLATION
Install the handlebars in the reverse order of removal.
Pay attention to the following points:
• Tighten the handlebar clamp nut to the specified torque.
#
Handlebar clamp nut: 60 N·m (6.0 kgf-m)
HANDLEBAR RIGHT SIDE PARTS
• Align the punch mark
A
on the handlebars with the front
brake holder matching surface. (UY125)
• Install the master cylinder. (UY125S)(
"
5-33)
http://mototh.com
Summary of Contents for UY125
Page 4: ...White Page http mototh com ...
Page 12: ...White Page http mototh com ...
Page 31: ...PERIODIC MAINTENANCE 2 19 http mototh com ...
Page 108: ...White Page http mototh com ...
Page 183: ...ELECTRICAL SYSTEM 6 7 8 Ignition coil 9 Starter relay 0 Starter motor http mototh com ...
Page 214: ...White Page http mototh com ...
Page 244: ...7 30 SERVICING INFORMATION FRONT WHEEL UY125 5 J _ http mototh com ...
Page 245: ...SERVICING INFORMATION 7 31 FRONT WHEEL UY125S Clearance 1 mm http mototh com ...
Page 246: ...7 32 SERVICING INFORMATION REAR WHEEL http mototh com ...