D 71
D
D_DF1
1
5_135C_
G
B
.f
m
. 71-
92 -
02-
01.
0
3
Set the switches, levers and controls listed below to the specified positions when the
screed has reached its operating temperature and a sufficient amount of material lies
in front of the screed:
- Push the drive lever (9) all the way to the front and start driving.Screed floating po-
sition is activated now.
- Observe the distribution of the material and adjust the limit switches if necessary.
- Set the compacting elements (tamper and/or vibration) according to the required
compaction ratio.
- Let the paving master check the layer thickness after 5–6 meters and correct if nec-
essary.
Carry out the check in the area of the drive chains or wheels as the screed tends to
level an uneven ground. The reference points for the layer thickness are the drive
chains or wheels.
The basic setting of the screed must be corrected when the actual layer thickness de-
viates significantly from the values indicated by the scales (see the operating instruc-
tions for the screed).
The basic setting is for asphalt material.
Item
Switch
Position
17
Traction drive fast/slow
Tortoise-operating speed
10
Preselector traction drive
Mark 6-7
33
Preparation for screed floating posi-
tion
LED ON
23
Vibration
LED ON
20
&
Tamper
LED ON
24/56 Auger left/right
Auto
32/54 Conveyor left/right
Auto
51
Levelling
Auto
A
Speed regulator, vibration
ca. mark 40-60
B
Speed regulator, tamper
ca. mark 40-60
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......