Interrupting/terminating operation
During breaks
- Determine the approximate duration.
- When cooling down of the material be-
low the minimum paving temperature
must be expected, run the paver fin-
isher empty and create an edge like
the end of a layer.
- Set the drive lever (9) to the center po-
sition.
During extended interruptions
- Drive lever (9) into centre position, RPM speed adjustment (10) to minimum position.
- Switch off ignition.
- Switch off screed heater (system).
- When screed is operated with the optional gas heating system, close the valves of
the bottles.
The screed must be heated up to the correct paving temperature before paving may
be restarted.
9
Element2_SPSC.cdr
10
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......