D 77
D
D_DF1
1
5_135C_
G
B
.f
m
. 77-
92 -
02-
01.
0
3
When work is finished
- Run the paver finisher empty and stop it.
- Lift the screed by using button (33).
- Retract the screed parts to the basic
screed width and lift the auger. Where
applicable, completely extend the lev-
elling cylinders.
- Insert the mechanic screed transport
safeguard (74) on both screed lifting
cylinders.
- While operating the tampers at a low
speed, let any material residues drop out.
- Set the drive lever (9) to the center po-
sition and the speed adjuster (10) to
minimum
- Switch off the ignition (5).
- Switch off screed heater (system).
- When screed is operated with the op-
tional gas heating system, close the
main shut-off valves and the valves of
the bottles.
- Remove the levelling units and stow
them away in the boxes, close all flaps
- Remove all parts that extend beyond the
paver finisher contour or secure them
if the paver finisher is to be transported
over public roads on a low-bed trailer.
Bohlensch.Tif
33
74
F0083_A1.Tif
9
Element2_SPSC.cdr
10
5
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......