E 2
E
DF 1
15/
135C.
G
B
2
-6 -
02-
01.
03
2
Distribution spreader
2.1
Height adjustment
The height of the distribution spreader
(1) – measured from its bottom edge –
should be minimum 50 mm (2 inches)
above the material laying height, de-
pending on the material mix.
Example:
Laying thickness 10 cm
Adjustment 15 cm from the
ground
In the event of incorrect height adjust-
ment, the following problems can occur
when laying:
- Spreader too high:
Unnecessary amount of material in front of the screed; material overflow. In the
case of large operating widths, tendency towards separation and traction problems.
- Spreader too low:
Insufficient amount of material compacted by the spreader. Resulting unevenness
cannot be completely levelled (wavy).
- Increased wear on the screed segments.
2.2
For mechanical adjustment with
ratchet
- Adjust the ratchet driving pin counter
clockwise or clockwise rotating. Driv-
ing to the left lowers the spreader, driv-
ing to the right lifts the spreader.
- Adjust the required height by alternate
operation of the left and right side.
- The current height can be read off on
the scale (1) in cm or inches (left col-
umn inches, right column cm).
F0130_A1.TIF
1
F0130_A1.TIF
Ratsche.TIF
1
Schnskal.TIF
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......