E 6
E
DF 1
15/
135C.
G
B
6
-6 -
02-
01.
03
3
Screed
All work for mounting, setting-up and
screed enlargement is described in the
screed operating instructions.
4
Electrical connections
After mounting and adjustment of the
mechanical assemblies, the following
connections must be established:
4.1
Connect remotes
to socket (17) (at the screed).
4.2
Connect grade transmitter
to socket (18) (at remote).
4.3
Connect spreader limit switch
to socket (19) (at remote).
4.4
Connect floodlight
to sockets (20) (at finisher).
17
F0171.tif
18
19
18
19
18
F0119_a.tif
AU-ENB2.tif
20
Schein.tif
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......