B 7
B DF
1
15/
135C.
G
B 7
-18
-
02
-01.
03
3.4
Horn
- on operation panel
- on both remotes
3.5
Power switch
The power switch is located on the right-
hand side of the paver finisher between
the central panel and hopper.
3.6
Trough safety lock
3.7
Screed safety lock
The screed safety locks are provided on
both sides on the operation panel behind
the seats.
Horn.tif
Horn_k.cdr
F0077_a1.eps
F0076A_A1.eps
F0083_a1.tif
Summary of Contents for DF 115 C
Page 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 40: ......
Page 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Page 132: ......
Page 178: ......