E 1
E DF1
1
5_135P.
G
B 1
-6
- 01.
03
E Setting-up and field replacement
1
Special safety information
Persons can be injured if the engine, final drive, flight bar conveyor, spreader, screed
or lifting devices are started unintentionally.
Unless otherwise described, work must be carried out only with the engine stopped!
- Securing the finisher to prevent unintentional starting:
Move the driving lever into the centre position and turn the preselector control to
zero; if necessary, remove final drive lock in the operation panel; remove ignition
key and battery switch.
- Mechanically secure raised machine components (e.g. screed or trough) against
lowering.
- Change spare parts properly or have them changed.
When connecting or disconnecting the hydraulic hoses and working on the hydraulic
system, hot hydraulic fluid can spray out under high pressure.
Switch off the engine and render the hydraulic system pressureless! Protect the eyes!
- Before re commissioning, refit all protective devices properly.
- When carrying out all work, the catwalk must extend over the entire screed width.
The hinged catwalk (optional for Vario screeds) must only be raised under the fol-
lowing conditions:
- When laying in the vicinity of a wall or similar obstacle.
- For transport on a trailer.
Summary of Contents for DF 115 P
Page 1: ...Operating instructions 02 0103 Paver Finisher 900 98 06 33 DF 115 P DF 135 P ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 42: ...D 4 D DF115_135P GB 4 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 44: ...D 6 D DF115_135P GB 6 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 104: ......
Page 152: ......