F 21
F
F
_
DF1
15_13
5P_G
B.
fm
.D
21-
42 -
0
1.
0
3
V-belt and notched v-belt (1.7)
- For checking and adjusting the belts
see engine’s operating instructions.
New V-belts stretch and must be reten-
sioned after an operating time of 15-20
minutes.
Engine mounting (1.8)
Check the engine mounting specifically
for damage and secure fixture.
If necessary, any damaged parts should
be replaced.
Observe engine’s operating instructions.
Hoses and hose connections (1.9)
Check all hoses on engine and all hy-
draulic hoses specifically for damage
and correct fixture.
$
Replace any damaged hoses immedi-
ately.
Aged hoses become porous and may
burst! Risk of accident!
A number stamped onto the hydraulic
hose screw connection provides infor-
mation about the date of manufacture
(1) and the maximum pressure permit-
ted for this hose (2).
Never fit overlapped hoses and note the permissible pressure level.
KeilCom2.tif
1
Pump.tif
DHH 09/00 225BAR
1
2
Summary of Contents for DF 115 P
Page 1: ...Operating instructions 02 0103 Paver Finisher 900 98 06 33 DF 115 P DF 135 P ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 42: ...D 4 D DF115_135P GB 4 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 44: ...D 6 D DF115_135P GB 6 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 104: ......
Page 152: ......