D 33
D DF1
1
5
_135P.
G
B 3
3
-6
6 -
0
1
.0
3
3
Operation
3.1
Preparing for operation
Required devices and aids
To avoid delays on site, check before starting work whether or not the following
devices and aids are present:
- Wheel loader for transporting heavy extendable parts
- Diesel fuel
- Engine oil and hydraulic oil, lubricants
- Separating agents (emulsion) and manual injector
- Two filled propane gas bottles
- Shovel and broom
- Scraper (spatula) for cleaning the auger and the hopper infeed area
- Parts that may become necessary for extending the auger
- Parts that may become necessary for extending the screed
- Percentage spirit level and levelling rail, 4 m long
- Levelling wire
- Protective clothing, signal vest, gloves, ear protection
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and
damages.
- Install parts removed for transportation or for the night.
- If optional screed with gas heating system is fitted, open closing valves and main
shutoff valves.
- Perform the check according to the ”Checklist for the machine operator” given
below.
Summary of Contents for DF 115 P
Page 1: ...Operating instructions 02 0103 Paver Finisher 900 98 06 33 DF 115 P DF 135 P ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 42: ...D 4 D DF115_135P GB 4 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 44: ...D 6 D DF115_135P GB 6 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 104: ......
Page 152: ......