When work is finished
- Run the paver finisher empty and stop
it.
- Raise screed: Move switch (1) to
central position, move switch (2) to
lower position and move switch (3) to
raise position.
- Retract the screed parts to the basic
screed width and lift the auger. Where
applicable, completely extend the
levelling cylinders.
- Insert the mechanic screed transport
safeguard (4).
- While operating the tampers at a low
speed, let any material residues drop
out.
- Set the drive lever (5) to the center
position and the speed adjuster (6) to
minimum.
- Switch off the ignition.
- Switch off screed heater system.
- If optional screed with gas heating
system is fitted, close main shut off
valves and valves of bottle.
- Remove the levelling units and stow
them away in the boxes; close all
flaps.
- Remove all parts that extend beyond
the paver finisher contour or secure
them if the paver finisher is to be trans-
ported over public roads on a low-bed
trailer.
Element1_KC.cdr
2
3
1
F0083_A1.TIF
4
Elemenrt2_KC.cdr
6
5
Summary of Contents for DF 115 P
Page 1: ...Operating instructions 02 0103 Paver Finisher 900 98 06 33 DF 115 P DF 135 P ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 12: ......
Page 42: ...D 4 D DF115_135P GB 4 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 44: ...D 6 D DF115_135P GB 6 66 01 03 Element2_KC cdr 7 9 12 11 6 A 9a 10 5 8 13 ...
Page 104: ......
Page 152: ......