1.
If necessary, identify the location of additional holes for the
faucet or other accessories and drill a 1/4” pilot hole from
the back side of the sink.
To prevent damage to the unit, do not use an auger style drill
bit.
B
Brre
ea
atth
hiin
ng
g H
Ha
az
za
arrd
d
When cutting or drilling the Swanstone
product, use a dust collection method
which prevents dust particles from going into the air.
Always work in a well-ventilated area. To keep the area well
ventilated, open windows and use exhaust fans. Always
use an OSHA approved dust mask when cutting, drilling, or
sanding Swanstone products.
2.
Drill fixture hole(s), using the 1/4” pilot hole for a guide,
with a 1-3/8” hole saw.
3.
Faucet may be installed at this time per manufacturer’s
instructions.
Vanity Top Installation — Cabinet Mount
1.
Install cabinet per manufacturer’s instructions.
Note:
Make sure cabinet is level before installing vanity top.
VI-005
VI-009
VI-008
WARNING
VI-003
IMPORTANT NOTICE
VI-002
800-325-7008
7
The Swan Corporation – Swanstone
Installation Procedure
Summary of Contents for Chesapeake Vanity
Page 19: ......