INTRODUCTION
1-4
09/2009
7.
Make sure work area is clear of people and obstacles prior to
dumping or unloading containers. SwapLoader strongly
recommends that a back up alarm be installed on the truck
chassis. The operation of the hook hoist is that the truck is
backed up to the body to pick it up and so there is a potential
pinch point between the body and the hook.
8.
Any container, which is on the hoist,
MUST
be unloaded
prior to performing any repairs or maintenance to the hoist.
Also,
DO NOT
allow any person to work on or be under the
hoist in a raised position without first installing adequate
safety blocks to eliminate all possibility of the hoist
accidentally lowering. SwapLoader strongly recommends
that if possible the container should be dismounted from the
hoist prior to performing any maintenance to the hoist.
9.
It is the responsibility of the owner and/or installer to insure that any additional safety
devices required by state or local codes are installed on the SwapLoader Hoist and/or
Truck Chassis.
10.
Keep away from overhead power lines. Serious injury or
death can result from contact with electrical lines. Use care
when operating hoist near electrical lines to avoid contact.
11.
Avoid contact with high-pressure fluids. Escaping fluid
under pressure can penetrate the skin causing serious injury.
Avoid hazardous conditions by relieving pressure before
disconnecting hydraulic or other lines. Tighten all
connections before applying pressure. Search for leaks with
a piece of cardboard, while protecting hands and body from
the high-pressure fluids.
12.
It is the responsibility of the owner to provide proper maintenance of the Safety Decals.
Regular inspection and replacing of Safety Decals that have any fading or damage which
would impair their function should be done (See the illustration on the following page for
location of Safety Decals).
Summary of Contents for SL-240
Page 1: ...Model SL 240 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 23: ...SL 240 INS 2 5 05 2020 ...
Page 25: ...SL 240 INS 2 7 05 2020 ...
Page 26: ...SL 240 INS 2 8 05 2020 ...
Page 31: ...SL 240 INS 2 13 05 2020 ...
Page 36: ...SL 240 INS 2 18 05 2020 ...
Page 41: ...SL 240 INS 2 23 05 2020 ...
Page 42: ...SL 240 INS 2 24 05 2020 ...
Page 43: ...SL 240 INS 2 25 05 2020 ...
Page 44: ......
Page 45: ......
Page 48: ......
Page 49: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 60: ......
Page 61: ......
Page 65: ...Page 3 of 7 28JUL09 ...
Page 66: ...Page 4 of 7 28JUL09 ...
Page 67: ...Page 5 of 7 28JUL09 ...
Page 68: ...Page 6 of 7 28JUL09 ...
Page 69: ...Page 7 of 7 28JUL09 ...
Page 70: ......
Page 73: ......
Page 76: ......
Page 77: ......
Page 80: ...Figure 4 ...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATION ...
Page 86: ......
Page 97: ...MAINTENANCE ...
Page 98: ......
Page 100: ...SL 240 MAI 4 2 05 2020 ...
Page 114: ......
Page 115: ...PARTS LIST ...
Page 116: ......
Page 117: ...52H05 REV D SL 240 SWAPLOADER HOIST BASE ASS Y 5 3 2 4 5 3 7 4 1 1 ...
Page 120: ...OUTER TUBE SUB ASSEMBLY SL 240 51H99 REV B ...
Page 122: ...FIXED JIB SUB ASSEMBLY SL 240 52H57 ...
Page 124: ......
Page 129: ...OPTIONS ...
Page 130: ......
Page 135: ...EHV TANK CIRCUIT SL 220 222 240 91H29 REV A ...
Page 136: ...EHV SUB ASSY PUMP CIRCUIT 200 SERIES 91H31 ...
Page 137: ...T M U S A LTD EHV VALVE HOSE CIRCUIT 200 SERIES 91H32 ...
Page 138: ......
Page 139: ......