WARNING:
Make sure work area is clear of people and
obstacles prior to dumping or unloading
containers. SwapLoader strongly recommends that
a back up alarm be installed on the truck chassis.
The operation of the hook hoist is that the truck is
backed up to the body to pick it up and so there is a
potential pinch point between the body and the
hook.
4.
Cycle the arm forward (left control lever forward), making sure the curved lifting bar is
securely attached to the hook. Release the brakes of the truck and steer to correctly align
the truck with the container. Watch the container rails to see that they come to rest
centered on the rear rollers. Do not extend the jib during lifting.
5.
When the container is resting on the frame, move the jib forward all the way to ensure the
container is held in the body locks (right control lever forward).
DUMPING
1.
Move the jib forward (right control forward) to ensure that the container is locked.
2.
Extend the main lift cylinders (left control backward).
CAUTION:
DO NOT RETRACT THE JIB WHILE DUMPING. Retracting the jib
during dumping may unlock the mechanical jib latches which could allow the
container to crash down onto the hoist and/or abruptly unload.
3.0.OPE.SL-240
Oct-18
3-2
Summary of Contents for SL-240
Page 1: ...Model SL 240 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 23: ...SL 240 INS 2 5 05 2020 ...
Page 25: ...SL 240 INS 2 7 05 2020 ...
Page 26: ...SL 240 INS 2 8 05 2020 ...
Page 31: ...SL 240 INS 2 13 05 2020 ...
Page 36: ...SL 240 INS 2 18 05 2020 ...
Page 41: ...SL 240 INS 2 23 05 2020 ...
Page 42: ...SL 240 INS 2 24 05 2020 ...
Page 43: ...SL 240 INS 2 25 05 2020 ...
Page 44: ......
Page 45: ......
Page 48: ......
Page 49: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 60: ......
Page 61: ......
Page 65: ...Page 3 of 7 28JUL09 ...
Page 66: ...Page 4 of 7 28JUL09 ...
Page 67: ...Page 5 of 7 28JUL09 ...
Page 68: ...Page 6 of 7 28JUL09 ...
Page 69: ...Page 7 of 7 28JUL09 ...
Page 70: ......
Page 73: ......
Page 76: ......
Page 77: ......
Page 80: ...Figure 4 ...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATION ...
Page 86: ......
Page 97: ...MAINTENANCE ...
Page 98: ......
Page 100: ...SL 240 MAI 4 2 05 2020 ...
Page 114: ......
Page 115: ...PARTS LIST ...
Page 116: ......
Page 117: ...52H05 REV D SL 240 SWAPLOADER HOIST BASE ASS Y 5 3 2 4 5 3 7 4 1 1 ...
Page 120: ...OUTER TUBE SUB ASSEMBLY SL 240 51H99 REV B ...
Page 122: ...FIXED JIB SUB ASSEMBLY SL 240 52H57 ...
Page 124: ......
Page 129: ...OPTIONS ...
Page 130: ......
Page 135: ...EHV TANK CIRCUIT SL 220 222 240 91H29 REV A ...
Page 136: ...EHV SUB ASSY PUMP CIRCUIT 200 SERIES 91H31 ...
Page 137: ...T M U S A LTD EHV VALVE HOSE CIRCUIT 200 SERIES 91H32 ...
Page 138: ......
Page 139: ......