●
Press the power on/off button once to turn the device on.
○
Dim lights around the edge of the PCB will light up.
○
To power the Asset Tracker OFF, press the on/off button again.
●
Reassemble the enclosure with the Asset Tracker powered on using
the 4 screws from the previous step.
○
The torque specifications for the enclosure screws is between
71 and 85 ozf-in.
SOMETHING BROKEN OR MISSING?
CONTACT SWARM CUSTOMER SUPPORT:
SUPPORT
@
SWARM.SPACE
Overview & Setup
© 2022 SWARM TECHNOLOGIES
SWARM
ASSET TRACKER
QUICKSTART GUIDE
PAGE
7