ThermShield Standard Square/Rectangular Installation Guide
16
Swegon reserves the right to alter specifications. 20210615 - L00010
Battery assembly
installation (floor/
ceiling) 2x2 & 2X1
Damper blade must be closed during installation!
The floor/ceiling is composed of concrete blocks
(minimum density of 550 kg/m³) or reinforced concrete
(minimum density of 2200 kg/m³) and with a minimum
thickness of 100mm.
Maximum dimension of fire dampers:
2X2 grid: 1200x800mm
*For battery installation 2x2 use 8x connecting frame and
2x connecting plate.
1. Prepare a hole of dimensions 2B + 140mm and 2H +
140mm and set all U profiles to a height of 118mm (use
blocks of aerated concrete to keep distance between
ceiling and profiles).
2. Arrangement of steel C profiles (27x18mm).
3. Place the dampers in the openings to the wall limit
mark (7) and bend the fixing bracket 90° (1). Put them
on U profiles and fix using the self-tapping screws every
150mm. Fix the dampers and profiles to the ceiling using
the screws for concrete. Place four connection profiles
from the installation kit to the dampers on both sides
and attach it using the self-tapping screws.
4. Fill the space between the dampers with mineral wool
(100 kg/m³ of density or higher) and then fill the space
between
Ensure that the damper is sufficiently supported!
7
1
(1) Accessories
(2) Type
(3) Length
FFD-A
-
CF60
-
800
(1)
(2)
Fire damper accessories
FD-A
Type
CF60 - Connecting frame 60mm
CF100 - Connecting frame 100mm
CP60- Connecting plate 60mm
CP100- Connecting plate 100mm
(3) Connecting frame length
200 ... 1200 [mm]
118
42
wall
Floor/ceiling
18mm
27mm
118
42
wall
118
42
wall
1
2
3
4