ThermShield Standard Square/Rectangular Installation Guide
18
Swegon reserves the right to alter specifications. 20210615 - L00010
60
30
60
120
30
Material compliant
with the
classification
from DOP
Mineral wool 350mm
wide
(140 kg/m³)
* Minimal distances from another damper or wall/ceiling.
Minimal separation
distance installation
Damper blade must be closed during installation!
1. Prepare opening in the wall according to page 3.
B (H) + 80mm or more (Firebatt installation- build the
subframe according to the drawing.
Fire damper can be installed with minimal distance of
30mm between wall/ceiling and 60mm from other
dampers.
2. Insert the fire dampers into the wall and fill the space
between the casings with mineral wool (140kg/m³) up to
flanges.
Fill the space between the wall/ceiling with mineral wool
(140kg/m³) up to flanges.
3. Fill the rest of the wall openings in accordance with the
relevant installation method.
*Examples for Firebatt installation
Ensure that the damper is sufficiently supported!
1
2
3
4