Installation
– Bare Brickwork Set
27
[ I ]
Bare Brickwork
−
Inside
1.
Sketch a wall cut-out of 27 x 58 cm minimum on the
appropriate spot on the wall.
Note
Technically speaking the higher up on the wall the device
is installed the better the performance. However, for best
aesthetics we recommend installing the device such that
the top edge is level with the top edge of your window
lintel.
2.
An additional 12 cm space in height is required for the 2
nd
Room adapter and duct connection.
Note
During construction protect the inside (air connections and
cable ends) of all ducting from dust.
3.
Sketch up the inside wall cut-out of 27 x 27 cm.
Note
27 cm is the minimum width.
Summary of Contents for bluMartin freeAir 100
Page 1: ...Manual G General O Operation I Installation S Service ...
Page 20: ...Installation Bare Brickwork Set 18 I Drawings ...
Page 21: ...Installation Bare Brickwork Set 19 I ...
Page 23: ...Installation Bare Brickwork Set 21 I ...
Page 24: ...Installation Bare Brickwork Set 22 I ...
Page 25: ...Installation Bare Brickwork Set 23 I ...
Page 26: ...Installation Bare Brickwork Set 24 I ...
Page 27: ...Installation Bare Brickwork Set 25 I ...
Page 28: ...Installation Bare Brickwork Set 26 I ...
Page 59: ...Service S 57 For troubleshooting visit the website www bluMartin de freeair support ...