Wall

Installation - Commissioning - Maintenance

Installation

See Figure 1.
1. Cut the opening in the wall. The size of the opening 

should be according to dimensions I x J, which are 
given in the Dimensions table on page 2. 

2. Place the commissioning box in the opening.
3. Insert the mounting frame into the commissioning box 

and secure it with screws in the short sides to the com-
missioning box and to the wall structure.

4. Insert to air distribution baffle into the mounting frame 

and lock it in position by means of wing nuts.

5. Press the diffuser face to engage it in the mounting 

frame.

Commissioning

Commissioning must be carried out with the diffuser face 
mounted. Pull the measuring tube and the damper adjust-
ment cords out of the air diffuser through a disc. Connect 
a manometer to the measuring tube. The desired commis-

sioning pressure can be calculated using the rated coef-
ficient of performance of the air diffuser. Set the damper 
to the correct blade position, tie a commissioning knot in 
the damper cords to indicate the damper position, then 
lock the cords.

Maintenance

The air diffuser can be cleaned, if necessary, using luke-
warm water with dishwashing detergent added or by 
vacuum cleaning using a brush nozzle. The duct system 
can be accessed after the air diffuser section has been 
removed, the acoustic baffle has been withdrawn, the air 
distribution discs have been moved to the side and the 
damper has been turned and withdrawn from its fastener 
from the inlet. See Figure 1.

Environment

The Building Materials Declaration is available from www.
swegon.com.

Figure 1. Installation. Commissioning.

p

q

k-factor

EAGLE Wall

Tomelilla

Sweden

400-200

+ALVT1 400-200-160-B

k-faktor=14,6/27,8

k

k

p

q

=

k

p

q

=

(    )

2

= Flow reading l/s  

p

 = Current pressure reading (Pa)

k

 = Commissioning factor