Accessories

Commissioning box: 

ALS The ALS box is made of galvanized 

sheet steel and contains a removable adjustment damper, fixed 
measurement tappings and sound absorbing material*

)

 with 

reinforced surface layer.

The ALS commissioning box is available with one or two differ-
ences in dimension between the inlet and the outlet and also a 
version for low installation where a low overall height is required. 
The ALS commissioning box is then supplied without outlet 
branch.

*

)

 Fire resistance rated to B-s1,d0 in accordance with EN ISO 11925-2.

Frame:

 SAR K. For aesthetic installation of a lowered diffuser.

Adapter:

 ADAPTER, for adaptation to various variants and 

makes of systemized false ceilings: Ecophon, Gyproc, Dampa etc. 
Also used for adaptation to optional sizes of lay-in ceilings, for 
instance 625 x 625 or 675 x 675.

Installation

To dismantle the diffuser face, insert a thin object, for example 
a Quick Access card or the equivalent, in between the diffuser 
face and the diffuser backing box in order to release the springs. 
Move the card from the centre out towards the corner, see 
Figure 2.

The inlet spigot of the diffuser backing box can be secured to the 
connecting duct by means of self-tapping screws or a blind rivets. 
For flush-mounting in fixed ceiling constructions, secure the termi-
nal by means of screws into place in the framework through either 
the sides or top of the diffuser backing box. The air diffuser and 
commissioning box in the version for low installation height must 
be centred and jointed together using the locking strip supplied. 
Secure the air diffuser in the correct position with self-tapping 
screws or pop rivets in the under side of the commissioning box.

For mounting in modular suspended ceilings, it is advisable to 
select air diffusers with outer dimensions of 595 x 595 mm. Posi-
tion these directly down in the T-bar framework, and then secure 
them to the duct system or to the commissioning box.

If an ALS commissioning box is used, it must be secured to the 
building structure by means of hangers or mounting brackets. 

The distance between the commissioning box and the air diffuser 
can be increased by as much as 500 mm with an ordinary circular 
duct without having to lengthen the measuring tubes and damper 
commissioning cords. See Figures 3 and 4.

Commissioning

Commissioning should be carried out with the face plate 
mounted. Pull the measuring tube and damper adjusting cord 
out through the face plate. Connect a manometer to the right 
measuring tube. The red or blue tube is used for supply air 
depending on whether a one or two-step ALS commissioning 
box is used. For extract air, use the transparent tube only. The 
required commissioning pressure can be calculated by means of 
the K-factor of the air diffuser/register. Adjust the damper to the 
correct position and tie a commissioning knot on the damper 
cords to indicate the damper setting. See Figure 1.

Measurement accuracy and requirement on straight duct before 
the commisioning box, see Figure 3. The requirements of straigh 
duct depends on the type of disturbance before the commis-
sioning box. Figure 3 shows a bend, a dimensional change and a 
T-piece. Other types of disturbances requires at least 2xD straight 
(D = connection dimension) for measurement accuracy of ± 10% 
of the flow.

The K-factor is specified on the product identification plate and 
also in the relevant commissioning instructions available at www.
swegon.com.

Maintenance

The air diffuser can be cleaned, if necessary, using lukewarm 
water with dishwashing detergent added or by vacuum cleaning 
using a brush nozzle. The duct system can be reached for clean-
ing after opening the diffuser face. If a type ALS commissioning 
box is used, swing the diffuser face to the side on its hinges so 
that you then can grip the handle of the tubular damper casing 
and rotate it out of its holder. See Figure 6.

Figure 1. Commissioning.

Quick 

Access

LOCKZONE Ceiling

Tomelilla

Sweden

200-600

+ALS 160 -200/125 -200

k

q

k = XX / XX

p

TILLUFT / SUPPLY AIR

TILLUFT / SUPPLY AIR

FRÅ

NLU

FT /

 EXTR

ACT AI

R

k

p

q

=

k

p

q

=

(    )

2

k-factor

q

 = flow reading l/s

p

 = current pressure reading (Pa)

k

 = commissioning factor

LOCKZONE 

Ceiling a

Installation – Commissioning – Maintenance

20160321

Summary of Contents for LOCKZONE Ceiling a

Page 1: ...building structure by means of hangers or mounting brackets The distance between the commissioning box and the air diffuser can be increased by as much as 500 mm with an ordinary circular duct without having to lengthen the measuring tubes and damper commissioning cords See Figures 3 and 4 Commissioning Commissioning should be carried out with the face plate mounted Pull the measuring tube and dam...

Page 2: ...Quick Access Installation Figure 4 Installation of air diffusers and commissioning box with low installation height Figure 5 To dismantle the damper 0xD 5 0xD 5 2xD 10 LOCKZONE Ceiling 2 Swegon reserves the right to alter specifications 20160321 ...

Page 3: ... 279 236 113 70 188 145 315 80 6 2 200 500 495 404 288 159 200 314 271 113 70 205 162 375 100 6 0 200 600 595 404 288 159 200 314 271 113 70 205 162 375 100 7 0 250 500 495 504 332 199 250 354 311 113 70 225 182 465 115 8 2 250 600 595 504 332 199 250 354 311 113 70 225 182 465 115 8 7 315 500 495 622 388 249 315 395 352 93 50 230 187 575 140 11 8 315 600 595 622 388 249 315 395 352 93 50 230 187 ...

Page 4: ... 18 4 Red 160 200 200 600 19 7 18 0 Red 200 250 250 500 27 4 Blue 160 250 250 600 28 1 25 6 Blue 200 250 250 600 30 9 27 4 Red 200 315 315 500 31 6 Blue 250 315 315 500 33 2 Red 200 315 315 600 36 5 35 1 Blue 250 315 315 600 39 6 39 6 Red 315 400 400 600 56 _ Red Number of measuring tubes 1 Extract air ALSd LOCKZONE C extract air Size Size Standard Tube colour 200 250 250 600 18 4 Transparent 250 ...