Installation – Commissioning – Maintenance

20150318

Installation

The SIRI damper should be installed at a suitable distance 
from obstruction sources. The SIRI damper must not be 
strained by the weight from connecting ducts. This is 
especially the case if it is connected to a vertical run of 
ducts. In undisturbed measurement an accuracy of ±5% is 
achieved. With installation options according to figure 2, an 
accuracy of ±10% is achieved. Casing leakage is according 
to ductwork leakage class C (EN 1751).

Commissioning

Maximum measurement deviation is ±10%, even when 
the damper i positioned near a T-piece, transition piece 
or duct bend. See figure 2, regarding straight duct length 
demands. The pressure differential can be read and the 
airflow can be determined from K-factors (COP) or com-
missioning diagrams by using the fixed measuring points.
A label containing k-factor table and commissioning dia-
grams is attached to one of the measuring points at deli-
very. When commissioning, set desired throttling using a 
screwdriver or ring spanner. See table "Ring spanner sizes".

 2D

 2D

 2D

 2D

 2D

 1D

Figure 1. Installation.

Figure 3. Installation alternatives and straight duct length 
demands.

Maintenance

The damper is maintenance-free. Whenever needed, clean 
the damper by vacuum-cleaning with a brush nozzle.
When cleaning a duct, first note what position the damper 
is set to before opening fully. Restore the setting of the 
damper after cleaning.

Figur 2. Commissionng air flow.

k

p

q

=

p

q

 = flow reading l/s

p

 = current pressure reading (Pa)

k

 = commissioning factor

Ring spanner sizes

SIRI – Size

Ring spanner size

80-160

8 mm

250-315

10 mm

400-630

15 mm

800

22 mm