GB.TBXZ342.130915
Registered design. The company reserves the right to make changes without prior notice.
www.swegon.com 1
Installation Instructions for the
TBXZ-3-42 Pipework Package, GOLD SD/GOLD CX 100/120
1. General
The pipework package is used for circulating a mixture of
water and glycol between two interconnected heat recov-
ery coils in a closed system.
The supply includes the following:
The pipework package
is supplied complete with insulated sheet-metal casing,
pump, control valve with actuator, expansion vessel,
safety valve, manometer and shut-off cocks, thermom-
eters, filling valve and air purging valve.
Basic circuit diagram
M
1
2
3
4
5
7
6
8
8
6
10
11
8
9
8
6
10
1 Air purging valve
2 Manometer
3 Safety valve
4 Filling valve
5 Expansion vessel
6 Shut-off valve
7 Pump
8 Thermometer
9 Control valve with actuator
10 Adjustment valve
11 Temperature sensor