background image

 

2.  Training Requirements

 

 

The original operating instructions must be accessible to the user before using 
the  device.  The  user  must  be  trained  on  the  equipment  by  the  operator  / 
owner. The operator / owner of the equipment shall bear full responsibility that 
proper training is carried out. All original instructions, signs and labels must be 
observed  when  using  this  device.  In  addition,  use  only  tested  and  approved 
harnesses,  attachment  points  and  connection  means.  Before  commissioning 
the device, perform a visual and a functional test. 

 

3.  Installation

 

 

3.1  Site selection 

 

Before installing the device it is necessary to have carefully examined all factors 
that may affect the use of the drum winch and other equipment. These factors 
include  job  set  up,  environmental  factors,  location  and  type  of  workplace 
hazards, location and strength of the anchorage point to which the drum winch 
is  mounted.  Leave  yourself  enough  time  to  consider  all  foreseeable 
possibilities.  Always  consult  a  competent  person  to  who  is  familiar  with  the 
dangers and localities in the specific workplace 
 
Estimate  the  expected  Load  Line  length  required.  Install  the  unit  so  that  the 
Load  Line  and  the  Endless  Line  easily  reach  the  lowest  point  of  the  expected 
work  location.  Consider  it  may  need  extra  length  if  the  person  has  to  perform 
work offset from the vertical. The Load Line must not be crossed and but must 
always be able to move freely. If necessary include in the work schedule the set 
up of safety barriers and signage so that other equipment, materials and people 
do not interfere with the proper operation of the unit. 
The  device  including  the  Load  Line  and  the  Endless  Line  must  not  pass  over 
sharp  edges  or  too  close  to  objects  where  they  might  catch.  Avoid  mounting 
locations where waste, pollutants, and falling objects may impair or damage the 
device, Load Line and Endless Line or cause injury to people. 

 

The drum winch must be free to move at the anchorage point and 

must not

 be 

rigidly  mounted.  (blue  sticker  must  be  outside  of  the  mast  and  if  you  use  our 
SWI-TEC protective-cover the Logo on the cover must be outside of the mast). 
The Load Line must 

always run vertically

 off the drum.  

 
Never  install  the  equipment  where  the  device  or  lines  risk  exposure  to 
electrical hazards. 
 
Note

 

Create a work plan and a rescue plan before starting the installation.  Take into 
consideration the original instructions and the risk assessment of the client. 

 
Caution

 

The  person  operating  the  device  must  be  secured  against  risk  of  falling  with 
his/her own tested and approved restraint or fall arrest system. Also, the person 
must be safeguarded against falling objects. 

Summary of Contents for Mastlift

Page 1: ...User Manual for Drum Winch SWI TEC Mastlift Last revised Mai 21 2017 Issued by Marco Bachmann Managing Director Neveta Nautica S L...

Page 2: ...Lifting a Person 7 4 2 Lowering a Person 7 4 3 Operation of the Brake Mechanism 7 5 Manufacturer s Guidelines 8 5 1 Checking the Drum Winch Before Each Use 8 5 1 1 Checking the Endless Line 9 5 1 2 C...

Page 3: ...persons The drum winch has a Load Line which is wound on a drum With the use of an Endless Line the Load Line can be wound onto or off the drum In this way the person is lifted or lowered A pawl ratc...

Page 4: ...force of about 26 daN is required on the Endless Line when a maximum load of 150 kg is applied to the top rope layer Load Line Cover material Polyester Core material Dyneema Diameter 6 mm Breaking St...

Page 5: ...expected work location Consider it may need extra length if the person has to perform work offset from the vertical The Load Line must not be crossed and but must always be able to move freely If nec...

Page 6: ...ints must be tested Approved connectors must meet the forces imparted by the anchorage points Attaching the device to crane hook is prohibited Caution A competent person must be consulted if the secur...

Page 7: ...Line and continue to pull evenly The person is then lowered in a smooth motion 4 3 Operation of the braking system The brake mechanism engages automatically the load is securely held in any position...

Page 8: ...his could induce dynamic loading forces which could exceed the maximum operating load Always locate the winch in such a manner that when raising and lowering the Load Line is prevented from chafing Th...

Page 9: ...asons this service has to be performed by the manufacturer or personnel approved by the manufacturer in writing Only the manufacturer or personnel approved by the manufacturer in writing may repair th...

Page 10: ...3 Press the Locking Lever black ball D and pull out the desired length of the Load Line F 4 After releasing the Locking Lever D the Load Line must be pulled out with a firm tug With this movement the...

Page 11: ...es replace or add parts to the drum winch Production and Distribution Distribution Germany SWI TEC DE GmbH Im Yachthafen Potsdam Kastanienallee 22 C DE 14471 Potsdam Tel 49 0 331 87000 448 E mail info...

Page 12: ...12...

Page 13: ...13...

Reviews: