background image

13.

 

Connecting the Feed & Return

 

Lines to the Filtration System 

- Cont.

Fig. 

2

3.1 on page 

#23

 shows how a typical Swim Joy solar pool heating system is plumbed into existing pool plumbing. 

This drawing may not be just like every system you encounter; the feed and return plumbing on a solar system may be 

reversed, or it may be a different type of filter, or it may have additional equipment such as a chlorinator, pool cleaner, 

gas heater, etc. It may also have a long run of plumbing from the pool equipment to the solar 

panels

.

Whether the system is like this or not, Fig. 

2

3.1 will help you understand the flow of water from the pool, through the 

pump,  filter,  solar  system,  and  back  to  the  pool.  Study  the  diagram  and  become  familiar  with  the  valves  needed 

to connect the solar 

panel

s to existing plumbing.

Notice  that  the  first  check  valve  is  plumbed  in  after  the  filter.  This  prevents  the  filter  from  being  backwashed  by 

the    water  draining  down  from  the  panels  when  the  pump  shuts  off. 

The  second  check  valve  l

 

ocated  on  the 

solar  return  prevents  water  from  back  f

 

lowi

 

ng  through  the  sol

 

ar  panels. 

The  3-way  valve  either  diverts  the 

water  to  the  solar  system  or  directly  back  to  the  pool.  This  3-way  valve  should  be  a  non-positive  seal  valve

  or 

specialized solar valve

. This enables the water in the solar system to drain back to the pool when the pump shuts off. 

The 2-way valves on the solar feed and return lines allow you to isolate (completely shut off

 

) the solar system.

1.

2.

3.

4.

5.

6.

7.

8.

Study the plumbing after the filter and decide where you are going to install the check valve and the PVC tee fitting 

(see Fig. 

2

3.1). If you have auxiliary equipment, you may need to re-plumb a portion of your existing plumbing so 

this equipment is located after the solar system as indicated in Fig. 

2

3.1. 

Cut the pipe after the filter where you have decided to locate the check valve and where your solar return  pipe will 

attach to your existing pool return line. If your pool plumbing is 1-½”, and you are running 2” plumbing to your solar 

system, you should be using 2” valves and piping for all of your new plumbing. Therefore you will need (2) 2”x1-½” 

reducer bushings to adapt your new 2” fittings to the existing 1-½” pipe. 

As discussed earlier in this manual, it is a good idea to assemble all pipe and fittings before cementing them just in 

case you make an error. Install a check valve on the pipe coming out of the filter. Be sure that the  arrow showing flow 

direction is pointed away from the filter. 

The 3-way valve will be installed next. It may come right next to the check valve, or you may have to use some pipe 

and fittings to locate it off the main line. As stated earlier, use as few 90-degree elbows as possible. 

Install the 2-way valve to the solar feed line and then connect the other side of the 2-way valve to one of the ports 

on the 3-way valve. 

Install the (2-1

8

10-02

9

) vacuum breaker about 4’ up the feed line and above the top of the filter using a PVC tee 

and  reducer  bushing.  Face  the  tee  to  the  outside  as  shown  in  Fig. 

2

3.1.  Wrap  the  threads  of  the  vacuum  breaker 

with Teflon tape and screw it into the 3/4” threaded reducer bushing. 

Install the second 2-way valve 

and second check valve 

to the solar return line. 

Determine now where to locate the PVC tee fitting. The tee may be located right next to the 3-way valve or elsewhere 

depending on your system. Connect the tee fitting first to the solar return line, then to the 3-way valve, and finally 

to the pool return line. 

INSTALLATION MANUAL - SWIM JOY SOLAR POOL HEATER

CONNECTING THE FEED & RETURN LINES

 

TO THE FILTRATION SYSTEM

 -

 CONT

 

-

 

2

4

Summary of Contents for 2-1100-008

Page 1: ...to follow procedure A little time spent understanding the system and its parts will assure a successful trouble free installation CAUTION SAFETY COMES FIRST When working on or around your roof or poo...

Page 2: ...tions contact your Swim Joy Representative for assistance As the installing contractor you are responsible for exercising good judgment when installing Swim Joy systems to protect the long term integr...

Page 3: ...d to complete the installation Don t take shortcuts Whenever possible panels should be installed so they are accessible without being walked on Walking on the panels should only take place when absolu...

Page 4: ...ed layout PUMP HORSEPOWER The horsepower of your swimming pool filtration pump must be adequate to supply the solar system with enough water to provide the recommended flow rate necessary for the pane...

Page 5: ...to allow for drain down If as a result of a unique roof design or adverse pool equipment locations as demonstrated in figure 4 1 below it is not possible to achieve complete automatic drain down manu...

Page 6: ...ROW INSTALLATION KIT One of these kits is required for each row of panels Your DIY System Kit will include one row installation kit It contains the parts necessary to connect the feed and return lines...

Page 7: ...anels you will need to purchase an additional row installation kit for each additional row of panels The row installation kit contains 2 2 1810 004 Panel Clamp Assembly 2 2 1810 003 End Cap and 2 2 18...

Page 8: ...TACHMENT SET Part 2 1410 023A ROW SPACER KIT Part 2 3045 003 PRESSURE TESTING KIT Part 2 3020 022 VACUUM RELIEF VALVE HEADER ATTACHMENT SET Part 2 1410 023H MANUAL DRAIN DOWN BIB ATTACHMENT SET Part 1...

Page 9: ...TOP Part 2 1810 020 PANEL CLAMP GASKET Part 2 1810 017 PANEL CLAMP LATCH Part 2 1810 018 VACUUM RELIEF VALVE Part 2 1810 029 REPAIR PLUGS Part 2 1120 001 PVC PIPE SUPPORT BRACKET BLACK 2 Part 30272 2...

Page 10: ...pe Schedule 40 PVC Fittings 3 Port Valve 2 Port Valve Check Valve Lag Screws Silicone Spray Pipe Supports Zip Ties Electrical Wire Nuts 12ga 14ga Electrical Wire With Ground Electrical Conduit PVC Cem...

Page 11: ...SWIM JOY SOLAR POOL HEATER 6 Solar Panel Layouts Hydraulics The following 4 layout and plumbing diagrams are the most common solar panel installations Fig 10 1 SINGLE ROW Fig 10 2 DOUBLE ROW Fig 10 4...

Page 12: ...e etc For commercial installations please contact a Swim Joy representative for system design assistance Top Mounting Pad Bottom Mounting Pad PVC Pipe Support Bracket Panel Clamp Assembly End Cap CPVC...

Page 13: ...PANEL CONFIGURATIONS There are many ways to configure a solar array The most common and preferred is in one continuous row as shown in Fig 10 1 on page 10 However there are recommended limits to the...

Page 14: ...plumbing techniques which will reduce the necessary flow rates on larger systems Plumbing runs should be as short as possible and the hot return pipe should have the shortest run to reduce potential h...

Page 15: ...e valve allows for water to drain back through the valve even while in the off position If you have a 3 way valve that is not non positive you can make it so by drilling an 1 8 hole in the diverter If...

Page 16: ...in both headers together ensuring the gasket is properly located in both header grooves and fully seated Only one gasket is used for each connection Place the bottom clamp underneath where both of the...

Page 17: ...both top and bottom headers attach end caps and attach pipe connectors NOTE On soft roof surfaces or lesser quality asphalt shingle an EPDM or aluminum pad underneath the panel clamp assembly may be...

Page 18: ...the very outside edge After positioning the mounting pads in the proper location on the first panel Panel A apply an ample amount of roof sealant to both the lag screw and to the roof for the 1st mou...

Page 19: ...um pad underneath the panel clamp assembly may be necessary to eliminate possible roof wear The bottom mounting pads feature a unique design that both secures the bottom header to the mounting surface...

Page 20: ...solar heating performance and reduces wind lift stress on the panels and mounting hardware Fig 19 1 below is an example of a rack constructed of galvanized steel framing stud material Fig 19 2 shows t...

Page 21: ...05 pipe connectors to the headers of the panels to be connected with the 2 1810 004 panel clamp assemblies using the same procedures outlined in the section on connecting solar panels together on page...

Page 22: ...pipe connector and then cement your 2 PVC pipe to the 2 PVC coupling If using 1 5 PVC pipe refer to Fig 21 2 above Cement the 1 5 PVC pipe directly to the 2 1810 005 pipe connector Alternatively a fit...

Page 23: ...tarted section The panel mounting hardware isn t designed to support the weight of the PVC plumbing pipe in addition to the weight of the panels PVC pipe will also sag if not properly supported PVC pi...

Page 24: ...ting the Feed Return Lines to the Filtration System Fig 23 1 INSTALLATION MANUAL SWIM JOY SOLAR POOL HEATER CONNECTING THE FEED RETURN LINES TO THE FILTRATION SYSTEM 23 2 1810 029 or 2 Way Valve or 2...

Page 25: ...our existing plumbing so this equipment is located after the solar system as indicated in Fig 23 1 Cut the pipe after the filter where you have decided to locate the check valve and where your solar r...

Page 26: ...plan on painting the pipe to match the house color IF YOU ARE INSTALLING AN AUTOMATIC SYSTEM The basic difference between the manual system just outlined and an automatic system is the use of a motor...

Page 27: ...the pool pump to completely fill the solar system If the pool pump is not operational shut off the ball valve on the feed line and use the garden hose to fill the system Once the solar system is comp...

Page 28: ...cure and that adequate silicone was used to prevent any roof leaks Be sure all panel riser tubes are snapped into the spacer bars except where they go around obstructions Be sure that the panel riser...

Page 29: ...ient professional looking Swim Joy solar pool heating system Turn the pool pump off Turn the 3 way valve so the closed indicator points toward the solar feed side of the valve If isolating the system...

Page 30: ...e air bubbles in the trap run water over the lid and each joint individually to see if the air bubbles will clear up using a garden hose If there is not a clear lid listen to pump noise for a smoother...

Page 31: ...flow Install issue A If the system is a single row array and there is adequate flow use the 2 way valve on the return line to throttle the flow back to produce more back pressure on the system This wi...

Page 32: ...ibutorforarepairkitandadjust the spacer bars to prevent future damage 3 Birds or squirrels have damaged the tubes Contactdistributorforarepairkitandadjust the spacer bars to prevent future damage THE...

Page 33: ...ess than 10 gallons per minute Adjust the 3 way valve to bypass some of the water 2 Seasonal normal operation In the cooler months of the year or on cool partly cloudy days temperature rise through th...

Page 34: ...ructions for repair Utilizing the repair chisel cut the damaged riser as close as possible to the header carefully avoiding damaging adjacent riser tube The sloped side of the chisel should face away...

Page 35: ...slide it over the stub of the poly insert for a straight eye pleasing fit REPEAT steps 1 4 for the other end of the riser tube At the opposite header 17 Repair Procedures Cont REPAIR PROCEDURES CONT 3...

Page 36: ...deserving of ISO 9001 2008 The solar energy system described by this manual when properly installed and maintained meets or exceeds the minimum standard established by the Solar Rating and Certificat...