12
PB 8242 -PB 8244
12
Frame 2
Frame 2
Frame 2 Construction
A. Frame 2 Construction cont.
1.
Using two (2) 4'' x 4'' x 96'' from
(Fig. 2)
, measure and position brackets on 4'' x 4'' x 96’’ as shown in
(Fig.5)
.
2.
Attach upper and lower 5/4'' boards as shown in
(Fig. 6)
Fig. 5
Fig. 6
(3)
2-1/2''
screws
per joint
2-1/2'' screw
5/4'
' x 4
'' x
47-1
/2''
5/4'
' x 4
'' x
47-1
/2''
82-1/2''
Screws must be vertically
aligned to pass through the
gap in the Wrap Loc Brackets.
•WARNING•
Avoid splitting your
lumber by offsetting
your screws at least
3/4’’ from edge.
(2)
2'' lag screws
Per Bracket
2'' Lag screw
Double check to make
sure structure is square
FLIP
FRAME
OVER
GAP