1. GENERAL INFORMATION/TROUBLE DIAGNOSIS
SYM
1-8
Do not let the wire harness been twisted as
installation.
Wire harnesses routed along the handlebar
should not be pulled too tight or have
excessive slack, be rubbed against or
interfere with adjacent or surrounding parts in
all steering positions.
Before operating a test instrument, operator
should read the operation manual of the
instrument. And then, conduct test in
accordance with the instruction.
With sand paper to clean rust on connector
pins/terminals if found. And then conduct
connection operation later.
Do you know how to set the
instrument to its measurement
position and the insert locations
of its two probes?
Clean rust.
http://www.motorcycle.in.th