6
. Cylinder Head / Valve
6-15
Install cylinder head side cover (3 bolts).
Install thermostat (2 bolts).
Loosen auto tensioner adjustment bolt and
remove bolt and spring.
Install tensioner and install spring and adjustment
bolt.
Install cylinder cover (4 bolts).
Install Air Injection system (AI) pipe. (4 bolts)
Install inlet pipe onto cylinder head.
Install and tighten spark plug.
Torque value: 1.0~2.0kgf-m
Caution
This model is equipped with more precision
4-valve mechanism so its tighten torque can
not be exceeded standard value in order to
avoid causing cylinder head deformation,
engine noise and leaking so that motorcycle’s
performance be effected.
Install the engine onto frame (refer chapter 5).
To this chapter contents
3 bolts
Tensioner bolts
Thermostat bolts
4 bolts
4 bolts
Summary of Contents for Citycom.300i
Page 5: ...Serial Number Home page Contents...
Page 38: ...2 Maintenance Information 2 17 Note To this chapter contents...
Page 46: ...3 LUBRICATION SYSTEM 3 8 Notes To this chapter contents...
Page 106: ...4 Fuel Injection System 4 60 Note To this chapter contents...
Page 173: ...10 AC Generator Starting Clutch 10 10 Notes To this chapter contents...
Page 195: ...12 Cooling System 12 14 Notes To this chapter contents...
Page 223: ...14 Brake System 14 12 Note To this chapter contents...
Page 244: ...17 Electrical System 17 5 FUSE Fuse circuit diagram To this chapter contents...
Page 262: ...17 Electrical System 17 23 Note To this chapter contents...
Page 270: ...19 Electrical Diagram 19 1 Home page Contents LH30W EFi Electrical Diagram 19...