48
S100 User Guide – Rev. D – June 2005
SyncServer S100
Test Results dialog
This screen shows whether the IRIG-B for your S100 failed or passed. In this example, the
IRIG-B failed.
There is no output to the “Mail test” field as no addresses had been provided in the System
Information dialog (
Figure 3-35
).
Click
Finish
.
Setup Complete dialog
This screen verifies your configuration of the S100:
•
Its time source
•
Modem phone number (if you designated dial-up as the backup source for time)
•
Host name
•
System location
•
Administrator e-mail
Figure 3-37:
Test Results shown
Figure 3-38:
Your IRIG set-up is complete
Summary of Contents for SyncServer S100
Page 2: ...2 S100 User Guide Rev D June 2005 1 ...
Page 20: ...12 S100 User Guide Rev D June 2005 1 SyncServer S100 ...
Page 60: ...52 S100 User Guide Rev D June 2005 SyncServer S100 ...
Page 94: ...86 S100 User Guide Rev D June 2005 SyncServer S100 ...
Page 108: ...100 S100 User Guide Rev D June 2005 SyncServer S100 Figure 5 43 Large Net NTP Configuration ...
Page 109: ...S100 User Guide Rev D June 2005 101 2 5 3 Figure 5 44 Large Net NTP Configuration 2 ...
Page 116: ...108 S100 User Guide Rev D June 2005 SyncServer S100 ...
Page 126: ...118 S100 User Guide Rev D June 2005 SyncServer S100 ...
Page 150: ...142 S100 User Guide Rev D June 2005 1 SyncServer S100 ...
Page 166: ...158 S100 User Guide Rev D June 2005 1 SyncServer S100 ...