CHECKLISTS
INSTALLATION AND COMMISSIONING CHECKLIST
•
Complete the Installation Check List and the Installer details below.
•
Instruct customer on the Symmetry
®
operation.
•
Ensure the customer understands the content of this manual.
FINAL CHECKLIST
Advise the customer that during the initial burning period of approximately 2 hours, some
smoke and smell may be experienced. During this period the heater should be operated on
‘High’ and the space being heated should be well ventilated. It may take up to 20 minutes of
operation for the logs to achieve their full flame pattern and glow.
The mesh dress guard is fitted to this appliance reducing the risk of fire and injury and no part
of it should be permanently removed.
•
For protection of young children or the infirm a secondary guard is required.
•
Ensure this Operation and Installation manual is left with the customer.
•Ensure the Customer understands that:
•No part of this appliance should be permanently removed.
•Paper or other material must not be burnt in this appliance.
•Young children and the infirm should be supervised at all times.
(To be completed by certified Gas Installer)
NO / YES
1. Appliance positioned in a suitable location (clearances, combustible clearances, mantels and
surrounds etc).
2. Was a Rinnai approved flue system installed and tested in accordance with the instructions?
3. Gas pressure checked and set?
4. Has the log set / burn media been installed as per instructions?
5. Appliance tested for correct operation and to ensure no gas leaks?
6. Customer instructed on operating procedure and safety requirements
7. Is the end-user fully aware of operating procedure?
8. Has the Mesh Dress Guard been fitted?