11
Directions For Use
Charging the Battery Using Charger Base/Power Supply
WARNING:
DO NOT use the Charger Base, or insert or remove the
Syris battery from the v900L Control Module in an oxygen enriched
environment.
WARNING:
Unplug the VTS1000 Power Supply from the AC main wall
outlet to remove main power.
WARNING:
DO NOT position VTS1000-Power Supply and VTS1000-
Charger Base where it is difficult to disconnect the Power Supply from
the AC main wall outlet.
Fully charge the battery before initial use of the v900L. A fully charged battery
will provide approximately 4 hours of continuous use.
Batteries are shipped in a partially charged state.
Select appropriate AC adapter and ensure that the AC adapter snaps securely
into Power Supply. Prior to initial use, plug the power supply into an approved
100-240 VAC, 50/60Hz wall outlet. Insert battery into Charger Base and the
indicator light begins to blink green indicating that charging has begun.
Charging is complete when the indicator light on the charger base unit turns
solid green, approximately five hours for initial full charge.
To avoid downtime, it is recommended that a second battery (VTS1000-BAT)
be acquired to allow the use of the v900L while the depleted battery is being
charged.
v900L
Indicator Light
Figure 2: Charger Base and Battery
Charger indicator lights can have four possible states as follows:
Solid Red No battery detected
Blinking Red Fault condition, battery
or charger defective
Blinking Green Charging
Solid Green Fully charged