background image

 

 

INSTALLATION INSTRUCTIONS 

for The Drinking Post Waterer 

 

The Drinking Post may be installed ANYWHERE you have a source of water under pressure. 

 

No electricity is necessary. 

 

Optimum water pressure requirement:  between 45 and 65 PSI. Anything over 65 PSI will require a pressure 

reducer.  

 

 

Under 25 PSI Drinking Post will not function properly.

 

 

 

1.

 

Dig the water supply trench and install your water line to the waterer installation point. 

2.

 

At point of installation enlarge hole to at least 3’ wide x 3’ wide and a minimum of 28” below frost line.   

3.

 

Put 10” of washed rock in the bottom of the hole and compact the washed rock to prevent further settling.   

 

It is imperative to dig AT LEAST 28” below the frost line at point of installation so you have room to put in 

10” x 36” x 36” of gravel and still install the base of the post 18” below the frost line.   

4.

 

With The Drinking Post lying on the ground and completely unboxed, push the interior of The Drinking Post down through 

the top of the 8” protective sleeve such that the bowl is recessed 1’ to 2’ and the valve on the bottom of The Drinking Post is 

sticking out through the bottom of the 8” protective sleeve and is clearly visible and accessible.   

5.

 

Wrap the end of the brass supply line guide with two to three wraps of Teflon tape.   

 

Thread the end of the supply line guide into the valve of The Drinking Post.   

 

ONLY HAND TIGHTEN this connection!  Tighten only until this connection is snug.  DO 

NOT OVER TIGHTEN! 

 

The reason this is so important is that when installation is complete, you will be able to remove and 

reinstall the Drinking Post from ground level without having to dig down to the connection point.  Reasons 

you may want to do this include flushing debris from your water line and/or routine maintenance and 

troubleshooting.  We don’t anticipate you would need to do this anytime soon, but should the need arise 

it’s a nice option to have. 

6.

 

Remove the hardware inside the plastic bag (four screws and four fender washers) that is taped to the supply line guide.  

Slide the interior of The Drinking Post back inside the protective 8” sleeve.  Line up the holes on the bottom of the 8” 

protective sleeve and the supply line guide.  Place one fender washer on each screw and fasten through the holes in the 8” 

protective sleeve to affix the supply line guide to the 8” protective sleeve. 

7.

 

Once The Drinking Post is secured inside the 8” protective sleeve, connect a 90-degree elbow to the bottom of the supply 

line guide.  The thread on the bottom of The Drinking Post supply line guide is a standard ¾” pipe thread.  

8.

 

Place  two bricks at the point of installation.  The top level of the 

bricks should be flush with the top level of the washed rock.  The 

brick  should be placed as illustrated such that once installed the 

edge of the outer 8” protective sleeve rests securely on the bricks. 

9.

 

Dig a trench in the gravel bed from your incoming water supply line to 

the point of installation where you have placed the bricks.  The trench 

should be roughly 5” deep to accommodate the length of the ¾” 

supply line guide sticking out the bottom of the assembled Drinking 

Post. 

 

 
 
 
 

Page 3 of 5

Need help? Give us a call: 1 (800) 461-3362

SystemEquine.com

Reviews: