 Air currents inside the duct may cause excessive vibration, especially 

when the longer sampling tubes are used. In these cases, a 3 inch floor flange 
(available at most plumbing supply stores) may be used to fasten the sampling 
tube to the other side of the duct. When using the flange/connector mounting 
technique, drill a 1 to 1 ¼ inch hole where the flange will be used.

[5.3]MODIfICATIONS Of SAMPLINg TUBES

There may be applications where duct widths are not what is specified for the 
installation. In such cases, it is permissible to modify a sampling tube that is 
longer than necessary to span the duct width.

Use a 0.193-inch diameter (#10) drill and add the appropriate number of holes 
so that the total number of holes exposed to the air flow in the duct is 10 to 12. 
Space the additional holes as evenly as possible over the length of the tube.

CAUTION:

 This procedure should only be used as a temporary fix. It is not 

intended as a permanent substitute for ordering the correct length tubes.

[5.4]REMOTE SAMPLINg TUBE INSTALLATION

The detector arrangement can also incorporate the remote mounting of the 
sampling tube and/or exhaust tube. In this case both the detector, sampling 
tube and exhaust tube (if included) should be rigidly mounted to withstand 
the  pressure  and  vibrations  caused  by  the  air  velocity.  The  location  of  the 
detector’s sampling tube should be such that there is uniform airflow in the 
cross section area. 

Pressure differential across the sampling and exhaust ports in the detector hous-
ing shall be verified to be between 0.01 and 1.11 inches of water. Do so by mea-
suring the pressure difference between the inlet and outlet ports on the detector 
housing using a manometer as described in the Measurement Tests sectiont of 
this manual.

[6]MEASUREMENT TESTS
[6.1]AIR fLOW

The DNRW is designed to operate over an extended air speed range of 100 to 
4000 FPM. To verify sufficient sampling of ducted air, turn the air handler on 
and use a manometer to measure the differential pressure between the two 
sampling tubes. The differential pressure should measure at least 0.01 inches 
of water and no more than 1.11 inches of water. Because most commercially 
available manometers cannot accurately measure very low pressure differen-
tials, applications with less than 500 FPM of duct air speed may require one 
of the following: 1) the use of a current-sourcing pressure transmitter (Dwyer 
Series 607) or 2) the use of aerosol smoke, see below for test descriptions.

TABLE 1. SAMPLINg TUBES RECOMMENDED fOR 
DIffERENT DUCT WIDThS:

Outside Duct Width

Sampling Tube Recommended*

Up to 1 ft.

DST1

1 to 2 ft.

DST1.5

2 to 4 ft.

DST3

4 to 8 ft.

DST5

8 to 12 ft.

DST10 (2-piece)

*Must extend a minimum of 

2

3

 the duct width

fIgURE 3. AIR DUCT DETECTOR SAMPLINg TUBE:

SAMPLING TUBE ENDCAP

ARROW MUST FACE 

INTO AIR FLOW

AIR FLOW 

DIRECTION

CAUTION:

 The sampling tube end cap, included with the detector, is critical 

to proper operation of the duct smoke detector. The end cap is needed to 
create the proper air flow to the sensor of the duct smoke detector. Once any 
sampling tube length adjustments are made, plug the end of the sampling 
tube with the provided end cap.

A plastic exhaust tube is included with the unit to be installed if needed. In-
stall into the housing connection that is downstream from the sampling tube 
connection. The exhaust tube can be installed from the front of the detector 
or the back. A longer 1 foot exhaust tube, model ETX, is available as an acces-
sory in cases where the molded exhaust tube does not extend at least 2 inches 
into the duct.

[5.2]SAMPLINg TUBE INSTALLATION

1.   For  tubes  shorter  than  the  width  of  the  duct,  slide  the  sampling  tube, 

with installed end cap, into the housing connection that meets the air-
flow first. Position the tube so that the arrow points into the airflow as 
shown in Figure 3. Per NFPA sampling tubes over 3 feet long should be 
supported at the end opposite of the duct detector. In ducts wider than 8 
feet, work must be performed inside the duct to couple the other section 
of the sampling tube to the section already installed using the ½ inch 
conduit fitting supplied. Make sure that the holes on both sections of the 
air inlet sampling tube are lined up and facing into the airflow.

2.   For tubes longer than the width of the air duct, the tube should extend 

out of the opposite side of the duct. Drill a ¾ inch hole in the duct op-
posite the hole already cut for the sampling tube. Ensure that the sam-
pling tube is angled downward from the duct smoke detector to allow for 
moisture  drainage  away  from  the  detector.    The  sampling  tube  should 
be angled at least 

1

4

” downward for every 12” of duct width per Figure 

4.There should be 10 to 12 holes spaced as evenly as possible across the 
width of the duct. If there are more than 2 holes in the section of the tube 
extending out of the duct, select a shorter tube using Table 1. Otherwise, 
trim the tube to leave approximately 1 to 2 inches extending outside the 
duct. Plug the end with the end cap and tape closed any holes in the 
protruding section of the tube. Be sure to seal the duct where the tube 
protrudes.

HIGH

LOW

9 VOLT

BATTERY

9 VOLT

BATTERY

9 VOLT

BATTERY

TO SAMPLING TUBE
TO EXHAUST TUBE

DIFFERENTIAL 

PRESSURE 

TRANSMITTER 

MODEL #607-01

15 TO 36 

VDC SUPPLY

1000 OHM 5%

1 WATT RESISTOR

VOLT METER FLUKE 

MODEL 87 OR 

EQUIVALENT

+

H0163-01

fIgURE 5. PROCEDURE fOR VERIfyINg AIR fLOW:

H0215-00