66/67 |
FDR-3G
Recommended Inspection Steps According to the EN 15 650:
1.Damper identification2.Date of inspection3.Inspecting electric connection of the activation mechanism (where
applicable)4.Inspecting damper for cleanliness and possible need for cleaning (where needed)5.Inspecting blade and
sealing condition, possible correction and logging (where needed)6.Inspecting proper fire damper closure7.Inspecting
damper functionality – opening and closing using the control system, physical examination of the damper’s behavior,
possible correction and logging (where needed)8.Inspecting end switches’ functionality in the open and closed
position, possible correction and logging (where needed)9.Inspect whether the damper is fulfilling its role as part of
the regulation system (where needed)10.Inspect whether the damper remains in its standard operating position.
11.The damper is usually part of a system. In that case the whole system needs to be checked as described in its
operation and requirements published by the builder of the system.
Supplement
Any deviations from the technical specifications contained in SystemairDESIGN and the terms should be discussedwith
the manufacturer. We reserve the right to make any changes to the product without prior notice,provided that these
changes do not affect the quality of the product and the required parameters.
Summary of Contents for 163262
Page 1: ...FDR 3G Circular Fire Damper Handbook ...
Page 19: ...19 67 FDR 3G ...
Page 20: ...20 67 FDR 3G ...
Page 23: ...23 67 FDR 3G ...
Page 24: ...24 67 FDR 3G ...
Page 27: ...27 67 FDR 3G ...
Page 28: ...28 67 FDR 3G ...
Page 31: ...31 67 FDR 3G ...
Page 33: ...33 67 FDR 3G Notes ve Vertical wall 1 Smaller distances maximum resistivity EI90 ve i o S ...
Page 35: ...35 67 FDR 3G ...
Page 36: ...36 67 FDR 3G ...
Page 39: ...39 67 FDR 3G ...
Page 40: ...40 67 FDR 3G ...
Page 67: ...Systemair DESIGN 2022 07 11 Handbook_FDR_3G_en GB Original instructions ...