8
Start-up
8.1
Prerequisites for commissioning
Attention!
1. You must mount and connect the device in accordance with the operating instructions.
2. Double check that all connections are correct.
3. The mains voltage must match the information on the rating plate.
4. The rated current on the rating plate will not be exceeded.
5. Make sure that no persons or objects are in the fan's hazardous area.
9
Setting for operation
9.1
Speed controller
1.01
9.1.1
Setting for operation as Speed controller
Signal to:
E1
E1
GND
14.02.2008
v_signal_e1.vsd
E1
Setting via external signal or external potentiometer (DIP 2 =
|
OFF
|
= factory
setting)
Setting range: Output voltage from approx. 0 - 100 % of connected line voltage or in
range of settings
“
n-min
”
up to
“
n-max
”
.
(Potentiometer
set
without function)
%
set
0
100
18.07.2011
v_set_pxet.VSD
set
For
setting via internal potentiometer (DIP 2 =
|
ON
|
)
Setting range: Output voltage from approx. 0 - 100 % of connected line voltage or in
range of settings
“
n-min
”
up to
“
n-max
”
.
18.07.2011
v_nmin_pxet.VSD
%
n-min
0
100
n-min
Minimum output voltage (basic speed)
Setting range: 0 - 100 % (
“
n-min
”
takes priority if over
“
n-max
”
).
18.07.2011
v_nmax_pxet.VSD
%
n-max
0
100
n-max
Maximal output voltage (speed limiter)
Setting range: 100 % -
“
n-min
”
.
Operating Instructions
RETP6 / RETP10
Start-up
L-BAL-E082-GB 1237 Index 002
Part.-No. 00163339-GB
17/31