Installation DBH, DBV - in the Board Duct
S-BM2 smoke control damper can be installed on “single” (tested according to EN 1366-9) or “multi” (tested according
to EN 1366-8) ductwork. This section does not depict duct hanger rules as those are dependent on the weight of the
duct itself and must be statically approved. Smoke control dampers must be suspended from solid ceiling slabs using
adequately sized threaded rods. When using anchors in the ceiling, use fire rated anchor (with suitable fire rating
certificate).
1.Prepare the duct connection or opening, clean and flatten the connecting surface.
2.Apply fire resistive coat (F5) on the connection surfaces.
3.Place the damper against the ductwork connection surfaces.
For vertical duct orientation: a. Fix the hangers (A2) to the damper body or on the accessory (A1) or cover boards (8).
b. If the duct is not yet installed place the damper with the hangers (A2) onto the load bearing hanger profile.
4.From boards (8) create collars and overlap the connection.
5.Fix the collar covering to the damper and ductwork with nails or pins as per duct system manufacturer instructions.
IMPORTANT
• The suspension of the damper must be loaded only with the weight of the damper.
• Suspension systems longer than 1,5 m require fire-resistant insulation.
• The interior of the S-BM2 smoke control damper must remain accessible for maintenance, it may be necessary to
create additional inspection panels in the connecting ducts.
• The fire resistivity of S-BM2 smoke control damper must be decreased to the duct performance.
• The maximum resistivity for in duct installation is EI120S with pressure level 2 (-1000 Pa … 300 Pa)
Installation Distances
According to the EN 1366-2 standard, the minimum distance from the wall or ceiling to the damper body is 75 mm.
For multiple crossings through a fire resistive wall, the minimum distance between two damper bodies is 200 mm.
This applies for distances between the damper body and a nearby foreign object crossing the fire resistive wall/duct.
DBH
DBV
S-BM2
125 × 325 ... 1000 × 1225
EI 120 (v
ed
- i ↔ o)
S1000C
mod
HOT400/30
MAmulti
d)
EN 1366-9
EN 1366-8
EI 120 (h
od
- i ↔ o)
S1000C
mod
HOT400/30
MAmulti
d)
Notes:
d)
- Duct per EN 1366-9 or EN 1366-8
v
ed
- Horizontal duct, (Vertical wall crossing)
h
od
- Vertical duct, (Horizontal floor/ceiling crossing)
Summary of Contents for A-S-BM2
Page 1: ...S BM2 Smoke Control Damper MA multi ...
Page 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Page 26: ...26 105 S BM2 ...
Page 27: ...27 105 S BM2 ...
Page 28: ...28 105 S BM2 ...
Page 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Page 30: ...30 105 S BM2 Damper minimum distances ...
Page 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 33: ...33 105 S BM2 ...
Page 34: ...34 105 S BM2 Fixing layout for battery installations ...
Page 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 38: ...38 105 S BM2 ...
Page 39: ...39 105 S BM2 ...
Page 40: ...40 105 S BM2 ...
Page 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 44: ...44 105 S BM2 ...
Page 45: ...45 105 S BM2 ...
Page 46: ...46 105 S BM2 ...
Page 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Page 48: ...48 105 S BM2 Damper minimum distances ...
Page 51: ...51 105 S BM2 ...
Page 52: ...52 105 S BM2 ...
Page 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 56: ...56 105 S BM2 ...
Page 57: ...57 105 S BM2 Fixing layout for battery installations ...
Page 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 61: ...61 105 S BM2 ...
Page 62: ...62 105 S BM2 ...
Page 63: ...63 105 S BM2 ...
Page 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 67: ...67 105 S BM2 ...
Page 68: ...68 105 S BM2 ...
Page 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Page 72: ...72 105 S BM2 ...
Page 75: ...75 105 S BM2 ...
Page 78: ...78 105 S BM2 ...
Page 79: ...79 105 S BM2 ...
Page 82: ...82 105 S BM2 ...
Page 83: ...83 105 S BM2 ...
Page 84: ...84 105 S BM2 ...
Page 87: ...87 105 S BM2 ...
Page 88: ...88 105 S BM2 ...
Page 89: ...89 105 S BM2 ...
Page 90: ...90 105 S BM2 ...
Page 100: ...100 105 S BM2 ...
Page 101: ...101 105 S BM2 ...
Page 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...