S-BM2 Handling & Manipulation
The S-BM2 is made of boards and can thus be considered fragile. Handling and manipulation must be done with
care. Smaller dimensions can be manipulated and placed in the installation opening by two persons. Bigger dimensions
are supplied with wooden blocks, those serve as support for suitable lifting equipment (forklift, crane). Please follow
both textual and graphic instructions:
1.Unpack the damper and place it in vertical position.
2.Remove grille and place the holder between the upper-most blade and the frame.
3.Carefully lift the smoke control damper with the forklift, crane.
4.Prepare the opening, damper hanger, connection surfaces and/or filling as per the desired installation type.
5.Place the smoke control damper in the opening (wall installation) or on the opening (duct installation).
6.Once the smoke control damper has been placed fix the damper to ductwork:
a) For wall installation - insert the filling as per desired installation.
b) For duct installation – fix the hangers so that the weight of the damper is supported.
7.Carefully remove the fork.
8.Remove the wooden support.
9.If the ductwork ends with the damper – install a grille or grilles.
Summary of Contents for A-S-BM2
Page 1: ...S BM2 Smoke Control Damper MA multi ...
Page 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Page 26: ...26 105 S BM2 ...
Page 27: ...27 105 S BM2 ...
Page 28: ...28 105 S BM2 ...
Page 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Page 30: ...30 105 S BM2 Damper minimum distances ...
Page 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 33: ...33 105 S BM2 ...
Page 34: ...34 105 S BM2 Fixing layout for battery installations ...
Page 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 38: ...38 105 S BM2 ...
Page 39: ...39 105 S BM2 ...
Page 40: ...40 105 S BM2 ...
Page 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 44: ...44 105 S BM2 ...
Page 45: ...45 105 S BM2 ...
Page 46: ...46 105 S BM2 ...
Page 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Page 48: ...48 105 S BM2 Damper minimum distances ...
Page 51: ...51 105 S BM2 ...
Page 52: ...52 105 S BM2 ...
Page 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Page 56: ...56 105 S BM2 ...
Page 57: ...57 105 S BM2 Fixing layout for battery installations ...
Page 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 61: ...61 105 S BM2 ...
Page 62: ...62 105 S BM2 ...
Page 63: ...63 105 S BM2 ...
Page 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Page 67: ...67 105 S BM2 ...
Page 68: ...68 105 S BM2 ...
Page 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Page 72: ...72 105 S BM2 ...
Page 75: ...75 105 S BM2 ...
Page 78: ...78 105 S BM2 ...
Page 79: ...79 105 S BM2 ...
Page 82: ...82 105 S BM2 ...
Page 83: ...83 105 S BM2 ...
Page 84: ...84 105 S BM2 ...
Page 87: ...87 105 S BM2 ...
Page 88: ...88 105 S BM2 ...
Page 89: ...89 105 S BM2 ...
Page 90: ...90 105 S BM2 ...
Page 100: ...100 105 S BM2 ...
Page 101: ...101 105 S BM2 ...
Page 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...