EVC-RZHC-HUB_Room-Zone-HUB with cabinet_inst_GB_tbm_27.11.2019
5
09.12.19
GD0
G
D
0
G0
G
G
0
G
0
G
U
O
3
U
O
1
U
O
2
U
O
3
U
O
1
U
O
2
R
S
48
5(
A
)
R
S4
85
(A
)
R
S4
85
(B
)
R
S
48
5(
B
)
A
I1
A
I1
A
I2
A
I2
A
G
N
D
A
G
N
D
+
C
+
C
D
I2
/C
I
D
I2
/C
I
D
I1
D
I1
socket assignment RZHC-HUB connector block assignment RC-C3 DOC
4. Connection Volume Flow Controller Optima-R with LMVAX-D3-MOD to RZHC-HUB
The volume flow controllers are each
connected to the RZHC hub with a 10 m EVC-
DC-10 damper connection cable,
total cable length: max. 30 m
- Connect exhaust air volume flow
controller to VAV ETA socket
- Connect supply air volume flow
controller to VAV SUP socket
5. connection CO2, VOC or humidity sensor to the RZHC-HUB
with a cable,
total cable length: max. 50 m
Only one CO2/VOC/humidity sensor can be connected per hub. The connection of the
respective sensor to the hub is described in the following section