48 / 48 | PP-28_201612 | PKIR, PKIS
Date of warranty
repair notification
Date of warranty
repair finalization
Description of warranty repair performed
Representative of the
manufacturer (stamp, signature)
Warranty Service
Damper Identification
Building
object
Emplace-
ment
Room no.
Position no.
Identifica-
tion
Signaliza-
tion
14
1396
IMOS-Systemair
90043 Kalinkovo 371, Slovakia
EN 15650 : 2010
Fire dampers round:
1396-CPR-0076:
PKIR3G
Nominal activation
conditions/sensitivity:
Pass
- sensing element load bearing capacity
- sensing element response temperature
Response delay (response time)
Pass
- closure time
Operational
reliability:
Pass
- motorized cycle
10.200 cycles
- manual cycle
50 cycles
- modulated
20.200 cycles
Fire resistance:
- maintenance of the cross section (under E)
- integrity E
resistivity depending
on installation method
and
situation
- Insulation I
- Smoke leakage S
- Mechanical stability (under E)
- Cross section (under E)
Durability of response delay:
- sensing element response temperature
and load bearing capacity
Pass
Durability of operational reliability
- Open and closing cycle
Pass
12, 14
1396
IMOS-Systemair
90043 Kalinkovo 371, Slovakia
EN 15650 : 2010
Fire dampers rectangular:
1396-CPD-0062:
PKIS-EI90S, PKIS-EI120S
1396-CPR-0077:
PKIS3G
Nominal activation conditions
/sensitivity:
Pass
- sensing element load bearing capacity
- sensing element response temperature
Response delay (response time)
Pass
- closure time
Operational
reliability:
Pass
- motorized cycle
10.200 cycles
- manual cycle
50 cycles
- modulated
20.200 cycles
Fire resistance:
- maintenance of the cross section (under E)
- integrity E
PKIS-
: EI90(ve ho i↔o)S
EI120(ve ho i↔o)S
PKIS3G
depending on installation
method and situation
- insulation I
- smoke leakage S
- mechanical stability (under E)
- cross section (under E)
Durability of response delay:
- sensing element response temperature
and load bearing capacity
Pass
Durability of operational reliability
- Open and closing cycle
Pass