10/48 | User Manual S-BM2 | 202010
202010 | User Manual S-BM2 | 11/48
Manipulation of S-BM2
The S-BM2 is made of boards and can thus be considered fragile. Handling and manipulation must be done with care.
Smaller dimensions can be manipulated and placed in the installation opening by two persons. Bigger dimensions are
supplied with wooden blocks, those serve as support for suitable lifting equipment (forklift, crane).
Please follow both textual and graphic instructions (Fig. 4 up to Fig. 10):
1. Unpack the damper and place it in vertical position.
2. Remove grille and place the holder between the upper-most blade and the frame.
3. Carefully lift the smoke control damper with the forklift, crane.
4.
Prepare the opening, damper hanger, connection surfaces and/or filling as per the desired installation type.
5. Place the smoke control damper in the opening (wall installation) or on the opening (duct installation).
6.
Once the smoke control damper has been placed fix the damper to ductwork:
a) For wall installation - insert the filling as per desired installation.
b) For duct installation – fix the hangers so that the weight of the damper is supported.
7. Carefully remove the fork.
8. Remove the wooden support.
9. If the ductwork ends with the damper – install a grille or grilles.
Fig. 4: Unpack the damper and place it in vertical position
Fig. 5: Remove grille and place the holder between the upper-most blade and the frame.
NOTE: Y1 = Cutting plane