46/48 | User Manual S-BM2 | 202010
Operating Journal
Activation of the Damper
Mark the Applied Installation Method with a Cross:
Wet
Dry
Fit
Date
Description of the Discovered Defects and the Date of the Following Inspection
after the Elimination of Deficiencies.
Inspection Technician’s Signature
In the Duct
In the Duct
On the Duct
On the Duct
On the Duct
On the Duct