Operation
S4600-ST®
31
Confirm the settling time wi
th “Next” and set the measurement time.
Then start the measurement with “START leakage test”.
The leakage measurement starts with the settling phase and after
the set time the pressure measurement will start. A counter in the
main display shows the duration of the running measurement in
seconds and minutes.
The start and the end of the pressure measurent is signalled
acoustically.
The measured values are held in the main display; you can save or
print the measurement log.