background image

08  COMPONENTS

1.Wheelbase.

(Figure 19)

1.Other sizes 

(Figure 20&21)

a.FC installation height:40mm          b.Battery case: 87.6mm*77.5mm

      

c.Inner size for gimbal: 17mm            d.Mounting height for gimbal: 230mm

     

e.Gimbal shell height: 208mm            f.Height of M690PRO: 462.5mm

        

13

09  DIMENSIONS

14

1

2

7

8

10

10

13
15

14

16

17

4

6

5

9

3

(Figure 17 Front view)

(Figure 19 Front view)

(Figure 18 Back view)

1

GPS

13

Top cover

14

Switch button

15

Frame

16

Back cover

17

Gimbal shell

7

Carbon tube

11

 Shock absorber

12

Power button

8

Arm fixing ring

9

Landing gear fixing ring

10

Landing gear tube 

2

GPS holder

3

Propeller

4

Motor

5

Motor mount

6

LED cover

700mm

Summary of Contents for T-DRONES M690PRO

Page 1: ...The low center of gravity design makes the aircraft more reliable Enhanced protection level Ease of use The arms landing gears and propellers can be folded and disassembled quickly Chute design for easy installation of battery No tools required Only 3 minutes to get ready to fly For the safety and steady operation of drones during assembly and calibration please make sure all parameters are at the ...

Page 2: ...battery is installed correctly and it is sufficiently charged 5 Please make sure the center of gravity of the UAV is correct FRAME CHECK 1 To avoid damage please make sure if series or parallel circuits are required when connecting batteries 2 Unlock and pull the throttle slightly to check if the motors rotate normally after pairing 3 Check on all the electronic devices and make sure they works norm...

Page 3: ... motor accessories 4 5 Gimbal parts 1 bag gimbal hook 4 M2 5 8 screw 4 M3 8 screw 4 6 3 Spread the arms to 180 degrees and turn the folding rings as per the instruction and secure the arms Make sure the arms are lined up with the frame otherwise they might get stuck and cause damage to the thread Figure 3 4 Assemble the landings gears to the frame as per Figure 4 Figure 3 Figure 4 1 2 3 4 5 ...

Page 4: ...igure 6 Please be aware of the limiting structure on the landing gear and make sure they are in place before secure the rings Figure 5 8 06 FC INSTALLATION Pixhawk 1 Remove the upper cover of the frame Figure 7 1 Take off the flight control mounting plate Figure 8 Figure 7 Figure 8 Figure 6 ...

Page 5: ...PS holder from the side and stick it to the holder with 3M tape Then turn the GPS fixing ring clockwise to the frame Please be aware of the limiting structure on the GPS holder and make sure they are in place before secure the rings Figure 11 6 After all connection are made and flight control is adjusted fix the top cover Figure 12 Figure 11 Figure 12 ...

Page 6: ...nstall the propeller according to Figure 13 Propeller installation completed as shown Figure 14 Make sure CW and CCW are in place 1 Remove gimbal shell Figure 15 2 Assemble the gimbal adapter Figure 16 Figure 13 Figure 15 Figure 16 Figure 14 11 12 ...

Page 7: ...t 208mm f Height of M690PRO 462 5mm 13 09 DIMENSIONS 14 1 2 7 8 10 10 13 15 14 16 17 4 6 5 9 3 Figure 17 Front view Figure 19 Front view Figure 18 Back view 1 GPS 13 Top cover 14 Switch button 15 Frame 16 Back cover 17 Gimbal shell 7 Carbon tube 11 Shock absorber 12 Power button 8 Arm fixing ring 9 Landing gear fixing ring 10 Landing gear tube 2 GPS holder 3 Propeller 4 Motor 5 Motor mount 6 LED cov...

Page 8: ...15 Figure 20 208 462 5 230 17 87 6 77 5 40 ...

Reviews: