Page 10
Air Gear Installation.
This is a basic air system setup with a gear
fail safe, dual air valves for gear and door
operations. Brakes system is also a basic
brake control setup. All components
available at www.pacificrcjets.com
Air Gear Installation Photos.
Adhere the two air tanks under the main
board in front of the bulkhead. Use the Zip
Tie mounts to secure your air lines in place.
T off at the center of the fuselage where
the airline to wing area is, use the provided
air line connections and be sure to
bring air lines out minimum 2
”
Fuel System Installation
There are different ways to rout your fuel
lines and other location to mount your
UAT, refer to the drawings on the right for
fuel system plumbing along with your
turbine manual. We recommend the PRCJ
Polyurethane tubing and always wire tie
for safety. We also recommend the
Kingtech UAT with PRCJ UAT mount and
ball valve mount.